Show on map
- Wind & solar
- In development
- Under construction
- Other infrastructure
- 10 · 100 · 1,000 MW
Map
- Wind & solar
- In development
- Under construction
- Other infrastructure
Olive - Haskell Canyon Swtiching Station 230 kV: route and 6 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Olive - Haskell Canyon Swtiching Station 230 kV
Transmission line
- Mapped route length
- Mapped route length: sourceLBNL · Open license, with creditmiles
- Voltage
- 230 kV
- States crossed
- US-CA
- Owner (as stated)
- LADWP
Details
Who’s behind it
- Owner
- LADWP
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Mapped route length (miles)
- 12
- Substations at the ends (as the source names them)
- Olive to Haskell Canyon Swtiching Station
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
| Attribute | Value |
|---|---|
| Owner, as the source states it | ladwp |
| HIFLD line ID | 400306 |
| Voltage class | 220-287 kV |
Sources
1 sourceSources LBNL
Sources
- LBNLYin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
Around this line
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Van Norman Bypass Solar Project Postponed | Solar | 1.5 mi | 2 |
| Six Flags Magic Mountain Under construction | Solar + storage | 5.3 mi | 12 |
| Homestead Energy Storage LLC Postponed | Storage | 5.9 mi | 14 |
| AB Van Nuys Announced | Solar | 6.3 mi | 1.6 |
| 20525 Nordhoff PV (North) Under construction | Solar | 7.8 mi | 1.9 |
| Foothill Solar Project Postponed | Solar | 8.1 mi | 1.1 |
Sources EIA-860M