Show on map
- Wind & solar
- Loads
- In development
- Under construction
- Operating
- Size not stated
- Other infrastructure
- 10 · 100 · 1,000 MW
Map
- Wind & solar
- Loads
- In development
- Under construction
- Operating
- Size not stated
- Other infrastructure
Olive - Reynolds 345 kV: route and 12 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Olive - Reynolds 345 kV
Transmission line
- Mapped route length
- Mapped route length: sourceLBNL · Open license, with creditmiles
- Voltage
- 345 kV
- States crossed
- US-IN
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Mapped route length (miles)
- 68
- Substations at the ends (as the source names them)
- Olive to Reynolds
All 2 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
| Attribute | Value |
|---|---|
| HIFLD line ID | 158418 |
| Voltage class | 345 kV |
Sources
1 sourceSources LBNL
Sources
- LBNLYin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
Around this line
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Mayapple Solar 1 Permitted | Solar | 0.0 mi | 224 |
| Honey Creek Solar Announced | Solar + storage | 0.1 mi | 220 |
| Mammoth South Solar Project Under construction | Solar | 0.1 mi | 300 |
| Mammoth Central II Solar Facility Under construction | Solar | 0.1 mi | 300 |
| St Joseph Energy Center Postponed | Gas, combined cycle | 0.4 mi | 1,406 |
| Mammoth Central Solar Project × 2 units Under construction | Solar | 0.8 mi | 600 |
| AMAZON DATA SERVICES INCORPORATED Built | Large load | 1.0 mi | |
| Champion Solar I Postponed | Solar | 1.6 mi | 51.9 |
| Hoosier Line Solar Announced | Solar | 5.4 mi | 180 |
| LPO DC CAMPUS Under construction | Large load | 9.0 mi | |
| Harvest Wind Energy Project Postponed | Wind | 14.6 mi |
Sources EIA-860M · EPA ICIS-Air · EPA ICIS-NPDES