Show on map
Oncor substation (OSM way 458726882) — Substation · OncorLamesa Solar — Postponed · Solar · TX · 100 MW · 8.1 mi awayIron Belt — Announced · Storage · TX · 400 MW · 12.1 mi awayBORDEN COUNTY DATA CENTER — Under construction · Large load · TX · 14.6 mi away
  • Storage
  • Loads
  • In development
  • Under construction
  • Size not stated
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Oncor substation (OSM way 458726882)

Substation

Key facts

Substation Operating
States crossed
US-TX
Operated by
Oncor

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Capacity not stated

All 16 attributes from OpenStreetMap power network, US — transmission lines and cables (69 kV and up, or voltage not tagged) and substations, from Geofabrik's US state extracts
Attributes
AttributeValue
Osm id458726882
RegionUS-TX
Outline
Type
Polygon
Coordinates
-101.8, 32.69, -101.8, 32.69, -101.8, 32.69, -101.8, 32.69, -101.8, 32.69
Osm typeway
Voltage (kV)138
Voltage raw138000;12500
Voltages kv138, 12.50
Scope regionsUS-TX
Voltage class100-161 kV
States crossedUS-TX
Extract regionsUS-TX
Location methodarea_centroid
Substation typedistribution
Voltage unknownNo
Coverage regionsUS-TX
Voltage assumed kvNo

Sources

1 source

Sources OpenStreetMap

© OpenStreetMap contributors

Sources

  • OpenStreetMapOpen license, with credit · retrieved Oct 10, 2026© OpenStreetMap contributors. Power lines, cables and substations filtered and reshaped by Inframation from the OpenStreetMap elements in Overture Maps' base/infrastructure theme; this derived database is available under the Open Database License 1.0 as GeoParquet files at https://tiles.inframation.io/grid/osm-power/ (latest.json names the current version's files; licence: https://www.openstreetmap.org/copyright)

Every source and license · Attribution

View at source

Around this asset

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Lamesa Solar Postponed Solar 8.1 mi 100
Iron Belt Announced Storage 12.1 mi 400
BORDEN COUNTY DATA CENTER Under construction Large load 14.6 mi

Sources EIA-860M · EPA ICIS-NPDES

Sources

Attribution