Show on map
Oncor substation (OSM way 710108965) — Substation · OncorHill County Generation Facility — Postponed · Gas, combustion turbine · TX · 928 MW · 6.9 mi awayHill Solar 1 — Under construction · Solar · TX · 405 MW · 11.5 mi awayHill Solar II — Under construction · Solar · TX · 200 MW · 12.5 mi awayTX 14 Venus Mill Storage — Postponed · Storage · TX · 100 MW · 13.8 mi awaySHARKA — Built · Large load · TX · 14.6 mi awayEdens Solar — Studied · Solar · TX · 70.8 MW · 14.7 mi away
  • Wind & solar
  • Loads
  • In development
  • Under construction
  • Operating
  • Size not stated
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Oncor substation (OSM way 710108965)

Substation

Key facts

Substation Operating
States crossed
US-TX
Operated by
Oncor

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Capacity not stated

All 16 attributes from OpenStreetMap power network, US — transmission lines and cables (69 kV and up, or voltage not tagged) and substations, from Geofabrik's US state extracts
Attributes
AttributeValue
Osm id710108965
RegionUS-TX
Outline
Type
Polygon
Coordinates
-97.19, 32.27, -97.19, 32.27, -97.19, 32.27, -97.19, 32.27, -97.19, 32.27
Osm typeway
Voltage (kV)69
Voltage raw69000
Voltages kv69
Scope regionsUS-TX
Voltage classunder 100 kV
States crossedUS-TX
Extract regionsUS-TX
Location methodarea_centroid
Substation typedistribution
Voltage unknownNo
Coverage regionsUS-TX
Voltage assumed kvNo

Sources

1 source

Sources OpenStreetMap

© OpenStreetMap contributors

Sources

  • OpenStreetMapOpen license, with credit · retrieved Oct 10, 2026© OpenStreetMap contributors. Power lines, cables and substations filtered and reshaped by Inframation from the OpenStreetMap elements in Overture Maps' base/infrastructure theme; this derived database is available under the Open Database License 1.0 as GeoParquet files at https://tiles.inframation.io/grid/osm-power/ (latest.json names the current version's files; licence: https://www.openstreetmap.org/copyright)

Every source and license · Attribution

View at source

Around this asset

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Hill County Generation Facility Postponed Gas, combustion turbine 6.9 mi 928
Hill Solar 1 Under construction Solar 11.5 mi 405
Hill Solar II Under construction Solar 12.5 mi 200
TX 14 Venus Mill Storage Postponed Storage 13.8 mi 100
SHARKA Built Large load 14.6 mi
Edens Solar Studied Solar 14.7 mi 70.8

Sources EIA-860M · EPA ICIS-Air · EPA ICIS-NPDES · ERCOT

Sources

Attribution