Show on map
Ortega Highway Energy Storage — Power plant · Storage · SDGE BatteriesMargarita Energy Center — Postponed · Gas, combustion turbine · CA · 48.2 MW · 4.9 mi awayHybrid Holdings 1 Capistrano — Postponed · Storage · CA · 4 MW · 7.6 mi away
  • Storage
  • Operating
  • 10 · 100 · 1,000 MW

Ortega Highway Energy Storage

Power plant · Storage

Key facts

Power plant · Storage Out of service
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2015
Net generation, 2025
0 MWh
Grid
12 kV to San Diego Gas & Electric Co (CISO)
Location
Orange County, California
Operated by
SDGE BatteriesSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2016 to 2025

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Storage source: “Batteries”
Age
11 years since 2015
All 5 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
WECC
Report year
2025
Grid voltage kv
12
Transmission owner
San Diego Gas & Electric Co
Balancing authority code
CISO
Balancing authority name
California Independent System Operator
Eia status
By code
OP
Mw
1
Units
1
OS
Mw
1
Units
1
Standby mw
0
Status rule
majority_mw_out_of_service
In service mw
2
Out of service mw
1
Fuel burned (MMBtu), 20250
Net generation (MWh), 20250
Balancing authority codeCISO
Data notes (1)
  • Capacity factor, 2025 not shown: net generation 0.0 MWh is not positive (the plant consumed at least as much as it produced over the year)

Timeline

  • In service · EIA-860M

Sources

3 sources

Sources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Margarita Energy Center Postponed Gas, combustion turbine 4.9 mi 48.2
Hybrid Holdings 1 Capistrano Postponed Storage 7.6 mi 4

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution