Show on map
Overland — Power plant · Solar · Greenbacker Renewable Energy CorporationKeenesburg — Under construction · Solar · CO · 7.2 MW · 13.2 km awayCrusoe Brighton Buildout TI — Filed · Large load · CO · 16.9 km awaySpindle BESS — Under construction · Storage · CO · 199 MW · 22.3 km awayPivot Solar 33 LLC — Under construction · Solar · CO · 5 MW · 22.3 km awayFort St Vrain — Under construction · Gas, combustion turbine · CO · 478 MW · 23.0 km awayPivot Solar 36 — Under construction · Solar · CO · 5 MW · 24.6 km awayPivot Solar 56 LLC — Under construction · Solar · CO · 3.6 MW · 24.8 km away
  • Combustion
  • Wind & solar
  • Storage
  • Loads
  • In development
  • Under construction
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

Power plant · Solar

Key facts

Power plant · Solarran 23% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2024
Net generation, 2025
22,070 MWh
Grid
15 kV to United Power, Inc (PSCO)
Location
Weld County, Colorado
Operated by
Greenbacker Renewable Energy CorporationSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2024 to 2025

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Solar source: “Solar Photovoltaic”
Age
2 years since 2024
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100001048757
Location id
L100001043254
Eia plant ids
68041
Grid
Nerc region
WECC
Report year
2025
Grid voltage kv
15
Transmission owner
United Power, Inc
Balancing authority code
PSCO
Balancing authority name
Public Service Company of Colorado
Fuel burned (MMBtu), 202575,303
Capacity factor, 20250.229
Net generation (MWh), 202522,070
Balancing authority codePSCO

Solar array

Array area (acres)
53
AC capacity (MW)
11
DC capacity (MW)
11.9
Mounting
Single-axis tracking
Site type
Greenfield
Began operating
2024

Source USPVDB

Source

  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb

Attribution

Timeline

  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · GEM · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Keenesburg Under construction Solar 13.2 km 7.2
Crusoe Brighton Buildout TI Filed Large load 16.9 km
Spindle BESS Under construction Storage 22.3 km 199
Pivot Solar 33 LLC Under construction Solar 22.3 km 5
Fort St Vrain Under construction Gas, combustion turbine 23.0 km 478
Pivot Solar 36 Under construction Solar 24.6 km 5
Pivot Solar 56 LLC Under construction Solar 24.8 km 3.6

Sources EIA-860M · FAA OE/AAA

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • FAA OE/AAAOpen license · retrieved Nov 9, 2026

Attribution