Show on map
- Wind & solar
- Storage
- Bioenergy
- In development
- Under construction
- Other infrastructure
- 10 · 100 · 1,000 MW
Map
- Wind & solar
- Storage
- Bioenergy
- In development
- Under construction
- Other infrastructure
Owens Illinois 115 kV line: route and 11 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Owens Illinois 115 kV line
Transmission line
- Mapped route length
- Mapped route length: sourceLBNL · Open license, with creditmiles
- Voltage
- 115 kV
- States crossed
- US-CA
- Owner (as stated)
- Pacific Gas Electric
Details
Who’s behind it
- Owner
- Pacific Gas Electric
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Mapped route length (miles)
- 0
- Substations at the ends (as the source names them)
- Owens Illinois
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
| Attribute | Value |
|---|---|
| Owner, as the source states it | pacific gas electric |
| HIFLD line ID | 303786 |
| Voltage class | 100-161 kV |
Sources
1 sourceSources LBNL
Sources
- LBNLYin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
Around this line
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Zeus BESS Contracted | Storage | 0.1 mi | 200 |
| Tracy BESS Under construction | Storage | 0.2 mi | 40 |
| TESLA Power Project Postponed | Gas, combined cycle | 4.3 mi | 1,322 |
| Tracy Renewable Power Plant Under construction | Biomass | 4.9 mi | 5 |
| Mulqueeney Wind Energy Under construction | Wind | 5.6 mi | 80 |
| Sand Hill B Filed | Wind | 6.4 mi | 17 |
| Sand Hill A Filed | Wind | 6.7 mi | 13.5 |
| Sand Hill C Contracted | Wind | 6.8 mi | 80.8 |
| Rooney Ranch Filed | Wind | 9.0 mi | 21 |
| Buena Vista Energy LLC Postponed | Storage | 11.4 mi | 100 |
| Tres Vaqueros Wind Farms LLC Withdrawn | Wind | 14.2 mi | 28.3 |