Show on map
Oxnard Wastewater Treatment Plant — Power plant · Biomass · City of Oxnard - (CA)Mission Rock Energy Center Hybrid — Postponed · Gas, combustion turbine · CA · 300 MW · 12.4 mi away
  • Bioenergy
  • Operating
  • 10 · 100 · 1,000 MW

Oxnard Wastewater Treatment Plant

Power plant · Biomass

Key facts

Power plant · Biomassran 30% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1981
Net generation, 2025
3,906 MWh
Grid
66 kV to Southern California Edison Co (CISO)
Location
Ventura County, California

Output

Net generation MWh by year, 2001 to 2026
Fuel burned MMBtu by year, 2001 to 2026
  • Gas
  • Biomass and waste

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Technology
Biomass source: “Other Waste Biomass”
Age
45 years since 1981
Heat rate
17,596 Btu/kWh 2025
All 7 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
WECC
Report year
2025
Grid voltage kv
66
Transmission owner
Southern California Edison Co
Balancing authority code
CISO
Balancing authority name
California Independent System Operator
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110000481292
Subparts reported
C
NAICS code
322130
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1006048
Fuel burned (MMBtu), 202568,732
Capacity factor, 20250.297
Heat rate (Btu/kWh), 202517,596.5
Net generation (MWh), 20253,906
Balancing authority codeCISO

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
NEW-INDY CONTAINERBOARD LLC Owner 100.0% Dec 31, 2023 EPA GHGRP
City of Oxnard - (CA) Operator EIA-860M

Timeline

  • In service · EIA-860M

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Mission Rock Energy Center Hybrid Postponed Gas, combustion turbine 12.4 mi 300

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution