Pacolet Tie 230 kV line: route and 5 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Pacolet Tie 230 kV line
Transmission line
- Mapped route length
- Mapped route length: sourceLBNL · Open license, with creditmiles
- Voltage
- 230 kV
- States crossed
- US-SC
- Owner (as stated)
- Duke Energy Carolinas
Details
Who’s behind it
- Owner
- Duke Energy Carolinas
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Mapped route length (miles)
- 16
- Substations at the ends (as the source names them)
- Pacolet Tie
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
| Attribute | Value |
|---|---|
| Owner, as the source states it | duke energy carolinas |
| HIFLD line ID | 180310 |
| Voltage class | 220-287 kV |
Sources
1 sourceSources LBNL
Sources
- LBNLYin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
Around this line
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Turkey Hill Solar I Postponed | Solar | 1.3 mi | 2 |
| VALARA HOLDINGS HIGH PERFORMANCE COMPUTE CENTER Under construction | Large load | 5.3 mi | |
| Highway 9 Solar Postponed | Solar | 10.5 mi | 2 |
| Davis Road Solar Postponed | Solar | 11.1 mi | 2 |
| Fairview Solar Postponed | Solar | 11.7 mi | 2 |