Show on map
Palo Verde 500 kV line — Transmission lineRed Hawk — Under construction · Gas, combustion turbine · AZ · 392 MW · 0.9 mi awayAgave — Under construction · Storage · AZ · 150 MW · 1.6 mi awayRomero Energy Center — Under construction · Storage · AZ · 225 MW · 12.1 mi awayRomero Energy Center II, LLC — Under construction · Storage · AZ · 225 MW · 12.1 mi awayDesert Sand BESS — Filed · Solar + storage · AZ · 600 MW · 13.5 mi away
  • Combustion
  • Wind & solar
  • Storage
  • In development
  • Under construction
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Palo Verde 500 kV line

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
500 kV
States crossed
US-AZ
Owner (as stated)
Arizona Public Service

Details

Who’s behind it

Owner
Arizona Public Service

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Mapped route length (miles)
3
Substations at the ends (as the source names them)
Palo Verde
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itarizona public service
HIFLD line ID306034
Voltage class500 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Red Hawk Under construction Gas, combustion turbine 0.9 mi 392
Agave Under construction Storage 1.6 mi 150
Romero Energy Center Under construction Storage 12.1 mi 225
Romero Energy Center II, LLC Under construction Storage 12.1 mi 225
Desert Sand BESS Filed Solar + storage 13.5 mi 600

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution