Show on map
Paragould — Power plant · Oil · Paragould Municipal Utilities (AR)
  • Combustion
  • Retired
  • 10 · 100 · 1,000 MW

Power plant · Oil

Key facts

Power plant · Oil Retired
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1939
Grid
13 kV to Paragould Light & Water Comm (SPA)
Location
Greene County, Arkansas
Operated by
Paragould Municipal Utilities (AR)SourceEIA-860M Preliminary Monthly Electric Generator Inventory

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Oil source: “Petroleum Liquids”
Age
87 years since 1939
1 attribute from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Balancing authority codeSPA

Retirement

EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.
Retired
September 2002
First unit retired
January 2002
Capacity retired
4.1 MW
Generators retired
5
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
1Petroleum Liquids0.4 MWRetiredJanuary 2002
2Petroleum Liquids1.1 MWRetiredJanuary 2002
4Petroleum Liquids0.8 MWRetiredJanuary 2002
6Petroleum Liquids1 MWRetiredJanuary 2002
5Petroleum Liquids0.8 MWRetiredSeptember 2002

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
13 kV
Transmission or distribution system owner
Paragould Light & Water Comm
Balancing authority
Southwestern Power Administration
NERC region
MRO
Transmission lines within 15 mi (4)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Timeline

  • Stated Unit 5 scheduled to retire, 0.8 MW · EIA-860M
  • Stated Units 1, 2, 4, 6 scheduled to retire, 3.3 MW · EIA-860M
  • In service · EIA-860M

Sources

3 sources

Sources EIA-860M · LBNL · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution