Show on map
Paris (WI) — Power plant · Gas, combustion turbine · Wisconsin Electric Power CoRed Oak Ridge Energy Center LLC — Studied · Gas, other · WI · 1,211.2 MW · 3.3 mi awayMLC 300 (Racine data centre) — Filed · Large load · WI · 4.7 mi away2250 (Racine data centre) — Filed · Large load · WI · 5.2 mi awayMICROSOFT CORPORATION - MKE 3B DATA CENTER — Built · Large load · WI · 6.1 mi awayTichigan Solar WI, LLC — Filed · Solar · WI · 6 MW · 8.9 mi awayRoot River Solar WI, LLC — Filed · Solar · WI · 6 MW · 11.2 mi awayZion Energy Center — Postponed · Gas, combustion turbine · IL · 397.8 MW · 14.3 mi awayIL - Renewable Properties - Bobcat - Wes — Under construction · Solar · IL · 4.5 MW · 14.6 mi away
  • Combustion
  • Wind & solar
  • Loads
  • In development
  • Under construction
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

Power plant · Gas, combustion turbine

Key facts

Power plant · Gas, combustion turbineran 6% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1995
Net generation, 2025
215,006 MWh
Grid
138 kV to American Transmission Co (MISO)
Location
Kenosha County, Wisconsin

Output

Net generation MWh by year, 2001 to 2025
Fuel burned MMBtu by year, 2001 to 2025
  • Gas
  • Oil

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, combustion turbine source: “Natural Gas Fired Combustion Turbine”
Age
31 years since 1995
Unused energy
3,128 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
Heat rate
13,200 Btu/kWh 2025
All 7 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
RFC
Report year
2025
Grid voltage kv
138
Transmission owner
American Transmission Co
Balancing authority code
MISO
Balancing authority name
Midcontinent Independent Transmission System Operator, Inc..
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110032904560
Subparts reported
C, D
NAICS code
221112
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1001108
Fuel burned (MMBtu), 20252,838,193
Capacity factor, 20250.064
Heat rate (Btu/kWh), 202513,200.5
Net generation (MWh), 2025215,006.0
Balancing authority codeMISO

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
Wisconsin Electric Power Co Operator EIA-860M
WEC Energy Group Owner 100.0% Dec 31, 2023 EPA GHGRP

Timeline

  • In service · EIA-860M

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Red Oak Ridge Energy Center LLC Studied Gas, other 3.3 mi 1,211.2
MLC 300 (Racine data centre) Filed Large load 4.7 mi
2250 (Racine data centre) Filed Large load 5.2 mi
MICROSOFT CORPORATION - MKE 3B DATA CENTER Built Large load 6.1 mi
Tichigan Solar WI, LLC Filed Solar 8.9 mi 6
Root River Solar WI, LLC Filed Solar 11.2 mi 6
Zion Energy Center Postponed Gas, combustion turbine 14.3 mi 397.8
IL - Renewable Properties - Bobcat - Wes Under construction Solar 14.6 mi 4.5

Sources EIA-860M · Berkeley Lab · FAA OE/AAA · EPA ICIS-Air

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • Berkeley LabOpen license, with credit · retrieved Nov 4, 2026Lawrence Berkeley National Laboratory and GridTracker, Queued Up data file (2026 edition), CC BY 4.0. Modified by Inframation: non-ISO and MISO regions only; MISO rows labelled with the date the file's queue data runs to; statuses and technologies mapped to Inframation's vocabulary. Queued Up Data File. Copyright (c) 2026, The Regents of the University of California, through Lawrence Berkeley National Laboratory (subject to receipt of any required approvals from the U.S. Dept. of Energy) & GridTracker.
  • FAA OE/AAAOpen license · retrieved Nov 13, 2026
  • EPA ICIS-AirOpen license · retrieved Nov 8, 2026

Attribution