Parr Road 138 kV line
Transmission line
- Mapped route length
- Mapped route length: sourceLBNL · Open license, with creditmiles
- Voltage
- 138 kV
- States crossed
- US-MI
- Owner (as stated)
- Consumers Energy
Details
Who’s behind it
- Owner
- Consumers Energy
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Mapped route length (miles)
- 14
- Substations at the ends (as the source names them)
- Parr Road
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
| Attribute | Value |
|---|---|
| Owner, as the source states it | consumers energy |
| HIFLD line ID | 101371 |
| Voltage class | 100-161 kV |
Sources
1 sourceSources LBNL
Sources
- LBNLYin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
Around this line
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| The Barn (Saline data centre) Filed | Large load | 2.6 mi | |
| Voyager Energy Storage Under construction | Storage | 6.6 mi | 100 |
| Beecher Solar Park Under construction | Solar | 8.0 mi | 80 |
| Wheeler Center Solar Park Postponed | Solar | 14.0 mi | 20 |
Sources FAA OE/AAA · EIA-860M