Payson
Power plant · Gas, reciprocating engine
Key facts
Power plant · Gas, reciprocating engineran 0% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 1988
- Net generation, 2025
- 6 MWh
- Grid
- 4 kV to Payson City Corporation (PACE)
- Location
- Utah County, Utah
- Operated by
- Payson City CorporationSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Output
- Gas
- Oil
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Gas, reciprocating engine source: “Natural Gas Internal Combustion Engine”
- Age
- 38 years since 1988
- Unused energy
- 172 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
- Heat rate
- 5,500 Btu/kWh 2025
All 5 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Fuel burned (MMBtu), 2025 | 33 |
| Capacity factor, 2025 | 0 |
| Heat rate (Btu/kWh), 2025 | 5,500 |
| Net generation (MWh), 2025 | 6 |
| Balancing authority code | PACE |
Retirement
EIA-860M September 2026StatusSome generators have retired; the rest of the plant is still in service. As of EIA-860M for September 2026.- Capacity retired
- 4.5 MW
- Generators retired
- 2
- Capacity still in service
- 19.6 MW
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| 86-3 | Natural Gas Internal Combustion Engine | 2.5 MW | Retired | August 2024 |
| 86-4 | Natural Gas Internal Combustion Engine | 2 MW | Retired | September 2024 |
Grid
EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).- Grid voltage at the plant
- 4 kV
- Transmission or distribution system owner
- Payson City Corporation
- Balancing authority
- PacifiCorp - East
- NERC region
- WECC
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Timeline
- Stated Unit 86-4 scheduled to retire, 2 MW · EIA-860M
- Stated Unit 86-3 scheduled to retire, 2.5 MW · EIA-860M
- In service · EIA-860M
Sources
3 sourcesSources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory
Sources
- EIA-860M Preliminary Monthly Electric Generator Inventory
- EIA Open Data bulk file — Electricity (ELEC.zip; monthly plant net generation and fuel consumption since 2001)Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
Around this plant
Nearby
within 25 km| Project | Kind | Away | MW |
|---|---|---|---|
| GRANITE FORTRESS LLC - JUAB DATA CENTER Under construction | Large load | 21.3 km |