Show on map
Pecos - Iron Mountain 230 kV — Transmission lineSnow Mountain Solar, LLC — Withdrawn · Solar · NV · 100 MW · 8.5 mi awayVitex Storage — Filed · Storage · NV · 300 MW · 12.7 mi awaySwitch NAP 16 — Under construction · Large load · NV · 14.6 mi awaySWITCH LTD. — Built · Large load · NV · 14.9 mi awaySwitch Data Center Building — Filed · Large load · NV · 15.0 mi away
  • Storage
  • Loads
  • In development
  • Under construction
  • Operating
  • Size not stated
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Pecos - Iron Mountain 230 kV

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
230 kV
States crossed
US-NV
Owner (as stated)
Nevada Power dba NV Energy

Details

Who’s behind it

Owner
Nevada Power dba NV Energy

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Mapped route length (miles)
9
Substations at the ends (as the source names them)
Pecos to Iron Mountain
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itnevada power dba nv energy
HIFLD line ID312794
Voltage class220-287 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Snow Mountain Solar, LLC Withdrawn Solar 8.5 mi 100
Vitex Storage Filed Storage 12.7 mi 300
Switch NAP 16 Under construction Large load 14.6 mi
SWITCH LTD. Built Large load 14.9 mi
Switch Data Center Building Filed Large load 15.0 mi

Sources CAISO · EIA-860M · FAA OE/AAA · EPA ICIS-Air

Sources

  • CAISOOpen license, with credit · retrieved Nov 18, 2026Source: California ISO
  • EIA-860MOpen license · retrieved Nov 4, 2026
  • FAA OE/AAAOpen license · retrieved Nov 16, 2026
  • EPA ICIS-AirOpen license · retrieved Nov 16, 2026

Attribution