Pelican — Power plant · Hydro · Pelican Utility
  • Clean firm
  • Operating
  • 10 · 100 · 1,000 MW

Power plant · Hydro

Key facts

Power plant · Hydroran 8% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1984
Net generation, 2025
1,721 MWh
Grid
2 kV to Pelican Utility
Location
Skagway Hoonah Angoon County, Alaska
Operated by
Pelican Utility

Output

Net generation MWh by year, 2001 to 2025
Fuel burned MMBtu by year, 2001 to 2025
  • Oil

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Hydro source: “Conventional Hydroelectric”
Age
42 years since 1984
All 4 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Eia status
By code
OP
Mw
1.60
Units
4
OS
Mw
0.800
Units
1
Standby mw
0
Status rule
some_units_retired
In service mw
2.40
Out of service mw
0.800
Fuel burned (MMBtu), 20257,042
Capacity factor, 20250.082
Net generation (MWh), 20251,721
Data notes (1)
  • Heat rate (Btu/kWh), 2025 not shown: computed 4091.8 outside 5000-30000 Btu/kWh

Retirement

EIA-860M September 2026StatusSome generators have retired; the rest of the plant is still in service. As of EIA-860M for September 2026.
Capacity retired
1.8 MW
Generators retired
7
Capacity still in service
2.4 MW
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
IC1Petroleum Liquids0.3 MWRetiredDecember 2011
IC2Petroleum Liquids0.1 MWRetiredDecember 2011
IC3Petroleum Liquids0.2 MWRetiredDecember 2011
IC4Petroleum Liquids0.2 MWRetiredDecember 2011
IC5Petroleum Liquids0.4 MWRetiredDecember 2011
IC8Petroleum Liquids0.2 MWRetiredMay 2024
IC6Petroleum Liquids0.4 MWRetiredNovember 2025

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
2 kV
Transmission or distribution system owner
Pelican Utility
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
Pelican Utility Operator EIA-860M
City of Pelican Owner 100.0% Dec 31, 2025 EIA-860

Timeline

  • Stated Unit IC6 scheduled to retire, 0.4 MW · EIA-860M
  • Stated Unit IC8 scheduled to retire, 0.2 MW · EIA-860M
  • Stated Units IC1, IC2, IC3, IC4, IC5 scheduled to retire, 1.2 MW · EIA-860M
  • In service · EIA-860M