Pelzer Lower — Power plant · Hydro · Central Rivers Power US, LLCGedosch Solar II — Postponed · Solar · SC · 2 MW · 5.7 km awayWebster Solar — Postponed · Solar · SC · 5.4 MW · 15.2 km awayIndigo Solar — Postponed · Solar · SC · 2 MW · 18.3 km awayYork Solar — Postponed · Solar · SC · 2 MW · 21.9 km awayDC Blox Inc Data Center Expansion — Built · Large load · SC · 23.1 km awayIWS ANDERSON DATA CENTER PROJECT PHASE 2 — Under construction · Large load · SC · 24.7 km away
  • Clean firm
  • Loads
  • Under construction
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

Pelzer Lower

Power plant · Hydro

Key facts

Power plant · Hydroran 13% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1989
Net generation, 2025
3,843 MWh
Grid
3 kV to Duke Energy Carolinas, LLC (DUK)
Location
Anderson County, South Carolina
Operated by
Central Rivers Power US, LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2001 to 2025

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Hydro source: “Conventional Hydroelectric”
Age
37 years since 1989
All 5 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
SERC
Report year
2025
Grid voltage kv
3.30
Transmission owner
Duke Energy Carolinas, LLC
Balancing authority code
DUK
Balancing authority name
Duke Energy Carolinas
Fuel burned (MMBtu), 202513,113
Capacity factor, 20250.133
Net generation (MWh), 20253,843
Balancing authority codeDUK

Timeline

  • In service · EIA-860M

Sources

3 sources

Sources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Gedosch Solar II Postponed Solar 5.7 km 2
Webster Solar Postponed Solar 15.2 km 5.4
Indigo Solar Postponed Solar 18.3 km 2
York Solar Postponed Solar 21.9 km 2
DC Blox Inc Data Center Expansion Built Large load 23.1 km
IWS ANDERSON DATA CENTER PROJECT PHASE 2 Under construction Large load 24.7 km