Show on map
Pennsauken Brownfield Solar — Power plant · Solar · Public Service Elec & Gas CoCROSS CONNECT SOLUTIONS — Built · Large load · PA · 4.4 mi awayEQUINIX — Large load · PA · 4.4 mi away365 DATA CENTERS — Built · Large load · PA · 4.4 mi awayH5 DATA CENTERS — Built · Large load · PA · 4.4 mi awayDeptford Solar One — Postponed · Solar · NJ · 3 MW · 11.4 mi away
  • Wind & solar
  • Loads
  • Operating
  • Stage not stated
  • Size not stated
  • 10 · 100 · 1,000 MW

Pennsauken Brownfield Solar

Power plant · Solar

Key facts

Power plant · Solarran 15% of 2025 Retiring
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2019
Net generation, 2025
16,066 MWh
Grid
26 kV to Public Service Elec & Gas Co (PJM)
Location
Camden County, New Jersey
Operated by
Public Service Elec & Gas CoSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2021 to 2025

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Solar source: “Solar Photovoltaic”
Age
7 years since 2019
All 5 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100000817247
Location id
L100000814462
Eia plant ids
65467
Fuel burned (MMBtu), 202554,817
Capacity factor, 20250.153
Net generation (MWh), 202516,066
Balancing authority codePJM

Solar arrays

Array area (acres)
26.4
AC capacity (MW)
12
DC capacity (MW)
15.2
Mounting
Single-axis tracking
Site type
Previous, current or suspected contamination
Began operating
2019

Source USPVDB

Source

  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb

Attribution

Retirement

EIA-860M September 2026StatusAt least half of the plant's in-service nameplate capacity is scheduled to retire, on dates its owner has reported to EIA. As of EIA-860M for September 2026.
Next scheduled retirement
December 2039
Capacity scheduled to retire
12 MW
Generators scheduled to retire
1
Share of in-service capacity scheduled
100%
Capacity still in service
12 MW
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
PENNSolar Photovoltaic12 MWScheduled to retireDecember 2039

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
26 kV
Transmission or distribution system owner
Public Service Elec & Gas Co
Balancing authority
PJM Interconnection, LLC
NERC region
RFC
Transmission lines within 15 mi (10)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Timeline

  • Stated Unit PENN scheduled to retire, 12 MW · EIA-860M
  • In service · EIA-860M

Sources

6 sources

Sources EIA-860M · GEM · LBNL · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
CROSS CONNECT SOLUTIONS Built Large load 4.4 mi
EQUINIX Unknown Large load 4.4 mi
365 DATA CENTERS Built Large load 4.4 mi
H5 DATA CENTERS Built Large load 4.4 mi
Deptford Solar One Postponed Solar 11.4 mi 3

Sources EPA ICIS-Air · EIA-860M

Sources

Attribution