Show on map
PERC LLC — Power plant · Biomass · Puyallup Energy Recovery Company, LLC
  • Bioenergy
  • Retired
  • 10 · 100 · 1,000 MW

Power plant · Biomass

Key facts

Power plant · Biomassran 2% of 2009 Retired
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1999
Net generation, 2009
419 MWh
Location
PIERCE County, Washington
Operated by
Puyallup Energy Recovery Company, LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2001 to 2009
Fuel burned MMBtu by year, 2001 to 2009
  • Biomass and waste

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Biomass source: “Landfill Gas”
Age
27 years since 1999

Retirement

EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.
Retired
April 2009
Capacity retired
2.7 MW
Generators retired
3
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
1Landfill Gas0.9 MWRetiredApril 2009
2Landfill Gas0.9 MWRetiredApril 2009
3Landfill Gas0.9 MWRetiredApril 2009

Grid

Not in EIA-860Grid fieldsEIA-860 states no grid voltage or transmission owner for this plant: its annual file lists plants with a generator in the report year, so a plant that retired earlier is not in it.
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Timeline

  • Stated Units 1, 2, 3 scheduled to retire, 2.7 MW · EIA-860M
  • In service · EIA-860M

Sources

3 sources

Sources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source