Show on map
Phelps Dodge Refining — Power plant · Gas, combustion turbine · Phelps Dodge Refining CorpOPPIDAN EL PASO DATA CENTER — Built · Large load · TX · 8.4 mi away
  • Combustion
  • Loads
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

Phelps Dodge Refining

Power plant · Gas, combustion turbine

Key facts

Power plant · Gas, combustion turbineran 34% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1986
Net generation, 2025
59,192 MWh
Grid
14 kV to El Paso Electric Co (EPE)
Location
El Paso County, Texas
Operated by
Phelps Dodge Refining CorpSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2001 to 2025
Fuel burned MMBtu by year, 2001 to 2025
  • Gas

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, combustion turbine source: “Natural Gas Fired Combustion Turbine”
Age
40 years since 1986
Unused energy
113 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
Heat rate
16,031 Btu/kWh 2025
All 7 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
WECC
Report year
2025
Grid voltage kv
13.80
Transmission owner
El Paso Electric Co
Balancing authority code
EPE
Balancing authority name
El Paso Electric Company
Eia status
By code
OP
Mw
12.60
Units
3
OS
Mw
7
Units
2
Standby mw
0
Status rule
some_units_idle
In service mw
19.60
Out of service mw
7
Fuel burned (MMBtu), 2025948,889
Capacity factor, 20250.345
Heat rate (Btu/kWh), 202516,030.7
Net generation (MWh), 202559,192
Balancing authority codeEPE

Timeline

  • In service · EIA-860M

Sources

3 sources

Sources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
OPPIDAN EL PASO DATA CENTER Built Large load 8.4 mi

Sources EPA ICIS-NPDES

Sources

Attribution