Pleasant Valley Mn - Byron 161 kV — Transmission lineNovel Loren Solar LLC CSG — Postponed · Solar · MN · 1 MW · 0.8 mi awayKalmar — Under construction · Solar · MN · 2.5 MW · 4.5 mi awayFranklin Heating Station — Under construction · Gas, combined cycle · MN · 27.6 MW · 10.1 mi awayDodge County Wind — Permitted · Wind · MN · 228 MW · 14.0 mi awayRinge — Under construction · Solar · MN · 2.5 MW · 14.3 mi away
  • Combustion
  • Wind & solar
  • In development
  • Under construction
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Pleasant Valley Mn - Byron 161 kV

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
161 kV
States crossed
US-MN
Owner (as stated)
Northern States Power Minnesota

Details

Who’s behind it

Owner
Northern States Power Minnesota

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Mapped route length (miles)
17
Substations at the ends (as the source names them)
Pleasant Valley Mn to Byron
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itnorthern states power minnesota
HIFLD line ID172827
Voltage class100-161 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Novel Loren Solar LLC CSG Postponed Solar 0.8 mi 1
Kalmar Under construction Solar 4.5 mi 2.5
Franklin Heating Station Under construction Gas, combined cycle 10.1 mi 27.6
Dodge County Wind Permitted Wind 14.0 mi 228
Ringe Under construction Solar 14.3 mi 2.5

Sources EIA-860M