Plympton Lake Street Solar

Power plant · Solar

Key facts

Power plant · Solarran 10% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2022
Net generation, 2025
2,019 MWh
Grid
32 kV, 30 kV to NSTAR Electric Company (ISNE)
Location
Plymouth County, Massachusetts

Output

Net generation MWh by year, 2024 to 2025

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Solar source: “Solar Photovoltaic”
Age
4 years since 2022
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100001048642
Location id
L100001043140
Eia plant ids
67924
Grid
Nerc region
NPCC
Report year
2025
Grid voltage kv
32.50, 30
Transmission owner
NSTAR Electric Company
Balancing authority code
ISNE
Balancing authority name
ISO New England Inc.
Fuel burned (MMBtu), 20256,889
Capacity factor, 20250.096
Net generation (MWh), 20252,019
Balancing authority codeISNE

Solar arrays

Array area (acres)
8.7
AC capacity (MW)
2.4
DC capacity (MW)
3.7
Mounting
Fixed tilt
Site type
Greenfield
Began operating
2022

Source USPVDB

Source

  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb

Attribution

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
REA Investments, LLC Operator EIA-860M
Lake Street 2022 Parent, LLC Owner 100.0% Dec 31, 2025 EIA-860

Timeline

  • In service · EIA-860M

Sources

6 sources

Sources EIA-860M · GEM · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory
  • EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Solar Carver 3 Hybrid Under construction Solar + storage 11.0 mi 2
Solar Carver 1 Hybrid Under construction Solar + storage 12.3 mi 4

Sources EIA-860M