Show on map
Potrero Hills Energy Producers — Power plant · Biomass · Potrero Hills Energy Producers, LLCCSP Solano — Postponed · Solar · CA · 5.1 MW · 7.0 mi awayCPV Vaca Station LLC — Postponed · Gas, combined cycle · CA · 670 MW · 9.5 mi awayVaca BESS — Filed · Storage · CA · 59.5 MW · 12.9 mi awayValero Refinery Cogeneration Unit 2 — Postponed · Gas, other · CA · 51 MW · 13.2 mi awaySolano Wind — Postponed · Wind · CA · 95.5 MW · 13.4 mi away
  • Storage
  • Bioenergy
  • In development
  • Operating
  • 10 · 100 · 1,000 MW

Potrero Hills Energy Producers

Power plant · Biomass

Key facts

Power plant · Biomassran 80% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2016
Net generation, 2025
55,949 MWh
Grid
21 kV to Pacific Gas & Electric Co (CISO)
Location
Solano County, California
Operated by
Potrero Hills Energy Producers, LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2016 to 2025
Fuel burned MMBtu by year, 2016 to 2025
  • Biomass and waste

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Biomass source: “Landfill Gas”
Age
10 years since 2016
Heat rate
10,190 Btu/kWh 2025
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
WECC
Report year
2025
Grid voltage kv
21
Transmission owner
Pacific Gas & Electric Co
Balancing authority code
CISO
Balancing authority name
California Independent System Operator
Fuel burned (MMBtu), 2025570,114
Capacity factor, 20250.798
Heat rate (Btu/kWh), 202510,189.9
Net generation (MWh), 202555,949
Balancing authority codeCISO

Timeline

  • In service · EIA-860M

Sources

3 sources

Sources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
CSP Solano Postponed Solar 7.0 mi 5.1
CPV Vaca Station LLC Postponed Gas, combined cycle 9.5 mi 670
Vaca BESS Filed Storage 12.9 mi 59.5
Valero Refinery Cogeneration Unit 2 Postponed Gas, other 13.2 mi 51
Solano Wind Postponed Wind 13.4 mi 95.5

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution