PPA Grand — Power plant · Storage · esVolta LPSanta Ana Storage 3 — Postponed · Storage · CA · 40 MW · 2.0 mi awaySolar Photovoltaic Project #47 — Postponed · Solar · CA · 1 MW · 4.8 mi awayVS HR Warner NEM, LLC — Under construction · Solar · CA · 1 MW · 6.1 mi awayWestminster Reliability Project, LLC — Under construction · Storage · CA · 110 MW · 11.7 mi away
  • Wind & solar
  • Storage
  • Under construction
  • Retired
  • 10 · 100 · 1,000 MW

Power plant · Storage

Key facts

Power plant · Storage Retired
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2016
Net generation, 2025
0 MWh
Grid
12 kV to Southern California Edison Co (CISO)
Location
Orange County, California
Operated by
esVolta LPSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2016 to 2025

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Storage source: “Batteries”
Age
10 years since 2016
All 3 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Fuel burned (MMBtu), 20250
Net generation (MWh), 20250
Balancing authority codeCISO
Data notes (1)
  • Capacity factor, 2025 not shown: net generation 0.0 MWh is not positive (the plant consumed at least as much as it produced over the year)

Retirement

EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.
Retired
September 2025
Capacity retired
2 MW
Generators retired
1
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
PE101Batteries2 MWRetiredSeptember 2025

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
12 kV
Transmission or distribution system owner
Southern California Edison Co
Balancing authority
California Independent System Operator
NERC region
WECC
Transmission lines within 15 mi (10)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Timeline

  • Stated Unit PE101 scheduled to retire, 2 MW · EIA-860M
  • In service · EIA-860M

Sources

4 sources

Sources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • LBNLOpen license, with credit · retrieved Nov 9, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Santa Ana Storage 3 Postponed Storage 2.0 mi 40
Solar Photovoltaic Project #47 Postponed Solar 4.8 mi 1
VS HR Warner NEM, LLC Under construction Solar 6.1 mi 1
Westminster Reliability Project, LLC Under construction Storage 11.7 mi 110

Sources EIA-860M