Show on map
Praxair — Power plant · Gas, reciprocating engine · Generate ER-NG, LLCFreeport Energy Center — Postponed · Gas, combined cycle · TX · 180 MW · 1.9 km awayBrazoria Solar I — Under construction · Solar · TX · 250 MW · 15.0 km awayWindmill Ridge Storage — Postponed · Storage · TX · 151.4 MW · 23.4 km away
  • Combustion
  • Wind & solar
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

Power plant · Gas, reciprocating engine

Key facts

Power plant · Gas, reciprocating engineran 2% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2019
Net generation, 2025
228 MWh
Grid
138 kV to CenterPoint Energy (ERCO)
Location
Brazoria County, Texas
Operated by
Generate ER-NG, LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2022 to 2025
Fuel burned MMBtu by year, 2022 to 2025
  • Gas

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, reciprocating engine source: “Natural Gas Internal Combustion Engine”
Age
7 years since 2019
Unused energy
10 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
Heat rate
14,105 Btu/kWh 2025
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
TRE
Report year
2025
Grid voltage kv
138
Transmission owner
CenterPoint Energy
Balancing authority code
ERCO
Balancing authority name
Electric Reliability Council of Texas, Inc.
Fuel burned (MMBtu), 20253,216
Capacity factor, 20250.022
Heat rate (Btu/kWh), 202514,105.3
Net generation (MWh), 2025228
Balancing authority codeERCO

Timeline

  • In service · EIA-860M

Sources

3 sources

Sources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Freeport Energy Center Postponed Gas, combined cycle 1.9 km 180
Brazoria Solar I Under construction Solar 15.0 km 250
Windmill Ridge Storage Postponed Storage 23.4 km 151.4

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution