Pretlow: location. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Pretlow
Power plant · Oil
Key facts
Power plant · Oilran 1% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2001
- Net generation, 2025
- 217 MWh
- Grid
- 13 kV to City of Franklin - (VA) (PJM)
- Location
- Southampton County, Virginia
- Operated by
- City of Franklin - (VA)SourceEIA-860M Preliminary Monthly Electric Generator Inventory
Operations
- Net generation, 2025
- 217
MWh - Fuel burned, 2025
- 2,609
MMBtu - Capacity factor, 2025
- 0.8
% - Heat rate, 2025
- 12,023
Btu/kWh
| Year | Net generation (MWh) | Fuel burned (MMBtu) | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|---|
| 2025 | 217 | 2,609 | 0.8% | 12,023 |
| 2024 | 448 | 1,935 | 1.6% | — |
| 2023 | 231 | 1,632 | 0.8% | 7,065 |
| 2022 | 255 | 2,289 | 0.9% | 8,976 |
| 2021 | 286 | 2,764 | 1.0% | 9,664 |
| 2020 | 232 | 2,254 | 0.8% | 9,716 |
| 2019 | 28 | 726 | 0.1% | 25,929 |
| 2018 | 29 | 360 | 0.1% | 12,414 |
| 2017 | 13 | 180 | 0.1% | 13,846 |
| 2016 | 31 | 276 | 0.1% | 8,903 |
| 2015 | 102 | 971 | 0.4% | 9,520 |
| 2014 | 86 | 836 | 0.3% | 9,721 |
| 2013 | 35 | 339 | 0.1% | 9,686 |
| 2012 | 28 | 255 | 0.1% | 9,107 |
| 2011 | 46 | 402 | 0.2% | 8,739 |
| 2010 | 105 | 993 | 0.4% | 9,457 |
| 2009 | 0 | 2,190 | — | — |
| 2008 | 281 | 2,642 | 1.0% | 9,393 |
| 2007 | 394 | 3,604 | 1.4% | 9,147 |
| 2006 | 426 | 3,670 | 1.5% | 8,615 |
| 2005 | 547 | 5,563 | 1.9% | 10,170 |
| 2004 | 527 | 6,048 | 1.9% | 11,471 |
| 2003 | 499 | 5,512 | 1.8% | 11,046 |
| 2002 | 720 | 7,491 | 2.6% | 10,404 |
How these are worked out
Net generation and fuel burned are the monthly figures EIA publishes in its bulk electricity file, from the plant's Form 923 reports; a year is the sum of its months. Capacity factor is a full year's net generation over today's nameplate capacity times the hours in that year (8,784 in a leap year), so a plant uprated or partly retired since reads against its current size; heat rate is fuel burned over net generation, for plants that burn fuel. A year with fewer than twelve months stated has no capacity factor, and a value outside the plausible range is left blank rather than shown. By month, the charts apply the same rules to each month's own hours and fuel.