Show on map
Primary Childrens Medical Center — Power plant · Gas, reciprocating engine · Primary Childrens Medical CtrDATA CENTER (200 S 200 E SLC) — Built · Large load · UT · 2.4 mi awayALIGNED DATA CENTER SLC-4 — Built · Large load · UT · 11.3 mi awayCONDUENT DATA CENTER — Large load · UT · 12.9 mi away
  • Combustion
  • Loads
  • Operating
  • Retired
  • Stage not stated
  • Size not stated
  • 10 · 100 · 1,000 MW

Primary Childrens Medical Center

Power plant · Gas, reciprocating engine

Key facts

Power plant · Gas, reciprocating engineran 1% of 2010 Retired
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1990
Net generation, 2010
195 MWh
Location
Salt Lake County, Utah
Operated by
Primary Childrens Medical CtrSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2001 to 2010
Fuel burned MMBtu by year, 2001 to 2010
  • Gas

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, reciprocating engine source: “Natural Gas Internal Combustion Engine”
Age
36 years since 1990

Retirement

EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.
Retired
October 2010
Capacity retired
1.8 MW
Generators retired
3
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
CG01Natural Gas Internal Combustion Engine0.6 MWRetiredOctober 2010
CG02Natural Gas Internal Combustion Engine0.6 MWRetiredOctober 2010
CG03Natural Gas Internal Combustion Engine0.6 MWRetiredOctober 2010

Grid

Not in EIA-860Grid fieldsEIA-860 states no grid voltage or transmission owner for this plant: its annual file lists plants with a generator in the report year, so a plant that retired earlier is not in it.
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Timeline

  • Stated Units CG01, CG02, CG03 scheduled to retire, 1.8 MW · EIA-860M
  • In service · EIA-860M

Sources

3 sources

Sources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
DATA CENTER (200 S 200 E SLC) Built Large load 2.4 mi
ALIGNED DATA CENTER SLC-4 Built Large load 11.3 mi
CONDUENT DATA CENTER Unknown Large load 12.9 mi

Sources EPA ICIS-NPDES

Sources

Attribution