Show on map
Project #1 - Altamont Landfill & Resource Recovery Facility — RNG project · Landfill gas to electricity · WM Renewable Energy LLCRooney Ranch — Filed · Wind · CA · 21 MW · 0.9 mi awaySand Hill A — Filed · Wind · CA · 13.5 MW · 2.7 mi awaySand Hill B — Filed · Wind · CA · 17 MW · 3.3 mi awaySand Hill C — Contracted · Wind · CA · 80.8 MW · 3.6 mi awayBuena Vista Energy LLC — Postponed · Battery storage · CA · 100 MW · 3.8 mi awayTres Vaqueros Wind Farms LLC — Withdrawn · Wind · CA · 28.3 MW · 4.8 mi awayMulqueeney Wind Energy — Under construction · Wind · CA · 80 MW · 5.2 mi awayTESLA Power Project — Postponed · Gas, combined cycle · CA · 1,322 MW · 5.2 mi awayAramis I Solar Project — Under construction · Battery storage · CA · 100 MW · 6.0 mi awayAramis I Solar Project — Under construction · Solar · CA · 100 MW · 6.0 mi awayTracy BESS — Under construction · Battery storage · CA · 40 MW · 9.5 mi awayZeus BESS — Contracted · Storage · CA · 200 MW · 9.6 mi awayNorCal FPV 1 — Under construction · Solar · CA · 10 MW · 10.6 mi awayNorCal FPV 1 (Pond 2) — Under construction · Solar · CA · 1.8 MW · 10.6 mi awayTracy Renewable Power Plant — Under construction · Biomass · CA · 5 MW · 12.7 mi away
  • Wind & solar
  • Storage
  • Bioenergy
  • In development
  • Under construction
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Project #1 - Altamont Landfill & Resource Recovery Facility

RNG project · Landfill gas to electricity

Key facts

RNG project · Landfill gas to electricity Operating
Location
Alameda County, California
Operated by
WM Renewable Energy LLCSourceEPA Landfill Methane Outreach Program (LMOP) Landfill and Project Database — landfill gas energy projects (owner/developer, project type, capacity, status)

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Project type
Gas Turbine
Technology
Landfill gas to electricity
Rated capacity
6.2 MW
LFG flow to project
3.46 MMscf/d
Host landfill
Altamont Landfill & Resource Recovery Facility
Start year
1989

Capacity not stated

All 12 attributes from EPA Landfill Methane Outreach Program (LMOP) Landfill and Project Database — landfill gas energy projects (owner/developer, project type, capacity, status)
Attributes
AttributeValue
EPA Renewable Fuel Standard registration
RIN D-codes
D3
Company
WM Renewable Energy, L.L.C.
Facility
SIMI VALLEY RNG
Facility type
Gas/Ethanol
Approved pathways
1
Landfills1
Actual generation (MW)4.64
Landfill opened1980
Landfill closure year2051
Waste in place (tons)68,280,716
Waste in place, year2022
Landfill design capacity (tons)119,799,566
Landfill gas collected (MMscf/d)6.06
Landfill gas generated (MMscf/d)9.03
Direct emission reductions (MMTCO2e/yr)0.235
Avoided emissions (MMTCO2e/yr)0.022
Data notes (1)
  • First registered not shown: EPA's Part 80 registration list is a current-state snapshot and states no registration or approval date

Timeline

  • In service · EPA LMOP

Around this asset

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Rooney Ranch Filed Wind 0.9 mi 21
Sand Hill A Filed Wind 2.7 mi 13.5
Sand Hill B Filed Wind 3.3 mi 17
Sand Hill C Contracted Wind 3.6 mi 80.8
Buena Vista Energy LLC Postponed Battery storage 3.8 mi 100
Tres Vaqueros Wind Farms LLC Withdrawn Wind 4.8 mi 28.3
Mulqueeney Wind Energy Under construction Wind 5.2 mi 80
TESLA Power Project Postponed Gas, combined cycle 5.2 mi 1,322
Aramis I Solar Project × 2 units Under construction Battery storage 6.0 mi 200
Tracy BESS Under construction Battery storage 9.5 mi 40
Zeus BESS Contracted Storage 9.6 mi 200
NorCal FPV 1 Under construction Solar 10.6 mi 10
NorCal FPV 1 (Pond 2) Under construction Solar 10.6 mi 1.8
Tracy Renewable Power Plant Under construction Biomass 12.7 mi 5

Sources EIA-860M · CAISO

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • CAISOOpen license, with credit · retrieved Nov 27, 2026Source: California ISO

Attribution