Show on map
Project #1 - Cerro Colorado LF — RNG project · Landfill gas direct useCorazon Energy Storage — Under construction · Storage · NM · 150 MW · 7.7 mi awayWESTPOINTE DATA CENTER — Built · Large load · NM · 9.3 mi awayOso Negro — Permitted · Storage · NM · 100 MW · 11.3 mi awayOSO GRANDE TECHNOLOGY — Filed · Large load · NM · 13.9 mi awayALBUQUERQUE PUBLIC SCHOOLS: DATA CENTER — Built · Large load · NM · 14.2 mi awayPRESBYTERIAN HEALTHCARE INFO SYS CTR — Built · Large load · NM · 14.6 mi away
  • Storage
  • Loads
  • In development
  • Under construction
  • Operating
  • Size not stated
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Project #1 - Cerro Colorado LF

RNG project · Landfill gas direct use

Key facts

RNG project · Landfill gas direct use Operating
Location
Bernalillo County, New Mexico

Details

Who’s behind it

Owner
City of Albuquerque New MexicoSource100.0%, EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT), as of Dec 31, 2023

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Project type
Boiler
Technology
Landfill gas direct use
LFG flow to project
0.432 MMscf/d
Host landfill
Cerro Colorado LF
Start year
2013

Capacity not stated

All 11 attributes from EPA Landfill Methane Outreach Program (LMOP) Landfill and Project Database — landfill gas energy projects (owner/developer, project type, capacity, status)
Attributes
AttributeValue
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110001553051
Subparts reported
C, HH
NAICS code
562212
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1004341
Landfills1
Landfill opened1990
Landfill closure year2076
Waste in place (tons)16,362,528
Waste in place, year2022
Landfill design capacity (tons)50,634,518
Landfill gas collected (MMscf/d)1.24
Landfill gas generated (MMscf/d)3.47
Direct emission reductions (MMTCO2e/yr)0.042
Avoided emissions (MMTCO2e/yr)0.004

Timeline

  • In service · EPA LMOP

Around this asset

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Corazon Energy Storage Under construction Storage 7.7 mi 150
WESTPOINTE DATA CENTER Built Large load 9.3 mi
Oso Negro Permitted Storage 11.3 mi 100
OSO GRANDE TECHNOLOGY Filed Large load 13.9 mi
ALBUQUERQUE PUBLIC SCHOOLS: DATA CENTER Built Large load 14.2 mi
PRESBYTERIAN HEALTHCARE INFO SYS CTR Built Large load 14.6 mi

Sources Berkeley Lab · EIA-860M · EPA ICIS-NPDES · EPA ICIS-Air

Sources

  • Berkeley LabOpen license, with credit · retrieved Nov 4, 2026Lawrence Berkeley National Laboratory and GridTracker, Queued Up data file (2026 edition), CC BY 4.0. Modified by Inframation: non-ISO and MISO regions only; MISO rows labelled with the date the file's queue data runs to; statuses and technologies mapped to Inframation's vocabulary. Queued Up Data File. Copyright (c) 2026, The Regents of the University of California, through Lawrence Berkeley National Laboratory (subject to receipt of any required approvals from the U.S. Dept. of Energy) & GridTracker.
  • EIA-860MOpen license · retrieved Nov 4, 2026
  • EPA ICIS-NPDESOpen license · retrieved Nov 8, 2026
  • EPA ICIS-AirOpen license · retrieved Nov 8, 2026

Attribution