Show on map
- Combustion
- Wind & solar
- Loads
- Under construction
- Operating
- Size not stated
- Other infrastructure
- 10 · 100 · 1,000 MW
Map
- Combustion
- Wind & solar
- Loads
- Under construction
- Operating
- Size not stated
- Other infrastructure
Project #1 - CID Recycling and Disposal Facility: location and 8 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Project #1 - CID Recycling and Disposal Facility
RNG project · Landfill gas to electricity
Key facts
RNG project · Landfill gas to electricity Operating- Location
- Cook County, Illinois
- Operated by
- WM Illinois Renewable Energy LLCSourceEPA Landfill Methane Outreach Program (LMOP) Landfill and Project Database — landfill gas energy projects (owner/developer, project type, capacity, status)
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Project type
- Gas Turbine
- Technology
- Landfill gas to electricity
- Rated capacity
- 3.1 MW
- LFG flow to project
- 1.98 MMscf/d
- Host landfill
- CID Recycling and Disposal Facility
- Start year
- 1988
Capacity not stated
All 11 attributes from EPA Landfill Methane Outreach Program (LMOP) Landfill and Project Database — landfill gas energy projects (owner/developer, project type, capacity, status)
| Attribute | Value |
|---|---|
| Landfills | 1 |
| Actual generation (MW) | 2.45 |
| Landfill opened | 1966 |
| Landfill closure year | 2007 |
| Waste in place (tons) | 31,065,972 |
| Waste in place, year | 2007 |
| Landfill design capacity (tons) | 31,065,973 |
| Landfill gas collected (MMscf/d) | 1.99 |
| Landfill gas generated (MMscf/d) | 2.07 |
| Direct emission reductions (MMTCO2e/yr) | 0.124 |
| Avoided emissions (MMTCO2e/yr) | 0.012 |
Timeline
- In service · EPA LMOP
Around this asset
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| W 167th St Under construction | Solar | 5.2 mi | 1.5 |
| Robbins Community Power LLC Postponed | Biomass | 6.4 mi | 55 |
| ITT Cogen Facility Under construction | Gas, reciprocating engine | 12.7 mi | 8.2 |
| Steger Under construction | Solar | 12.8 mi | 2 |
| IL - SMHEC - Moraine Valley Postponed | Solar | 13.4 mi | 1.3 |
| HYDRAVAULT LLC Built | Large load | 13.4 mi | |
| QUALITY TECHNOLOGY SERVICES LLC Built | Large load | 13.8 mi | |
| EQUINIX LLC Built | Large load | 13.9 mi |
Sources EIA-860M · EPA ICIS-Air