Show on map
Project #1, Expansion #1 - Brevard County Central Disposal Facility — RNG project · Landfill gas to electricity · Energy Power PartnersVIERA DATA CENTER - PHASE 1 — Built · Large load · FL · 12.5 mi awayKENNEDY DATA CENTER — Built · Large load · FL · 13.8 mi away
  • Loads
  • Operating
  • Size not stated
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Project #1, Expansion #1 - Brevard County Central Disposal Facility

RNG project · Landfill gas to electricity

Key facts

RNG project · Landfill gas to electricity Retired
Location
Brevard County, Florida
Operated by
Energy Power PartnersSourceEPA Landfill Methane Outreach Program (LMOP) Landfill and Project Database — landfill gas energy projects (owner/developer, project type, capacity, status)

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Project type
Reciprocating Engine
Technology
Landfill gas to electricity
Rated capacity
3.2 MW
LFG flow to project
1.584 MMscf/d
Start year
2009

Capacity not stated

All 11 attributes from EPA Landfill Methane Outreach Program (LMOP) Landfill and Project Database — landfill gas energy projects (owner/developer, project type, capacity, status)
Attributes
AttributeValue
Landfills1
Actual generation (MW)2.88
Landfill opened1972
Landfill closure year2023
Project shutdown year2020
Waste in place (tons)24,302,604
Waste in place, year2022
Landfill gas collected (MMscf/d)1.35
Landfill gas generated (MMscf/d)7.35
Direct emission reductions (MMTCO2e/yr)0
Avoided emissions (MMTCO2e/yr)0

Timeline

  • In service · EPA LMOP

Around this asset

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
VIERA DATA CENTER - PHASE 1 Built Large load 12.5 mi
KENNEDY DATA CENTER Built Large load 13.8 mi

Sources EPA ICIS-NPDES

Sources

Attribution