Show on map
Project #1, Expansion #2 - DFW Recycling & Disposal Facility — RNG project · Landfill gas to electricity · WM Renewable Energy LLC2501 Edmonds Ln Lewisville TX Data Center — Filed · Large load · TX · 2.6 mi awayQUALITY INVESTMENT PROPERTIES IRVING — Built · Large load · TX · 8.4 mi awayQTS 6431 Longhorn Dr. Irving TX — Built · Large load · TX · 8.4 mi awayLR 1300 (Irving data centre) — Filed · Large load · TX · 8.9 mi awayAREP LAS COLINAS DATA CENTER — Under construction · Large load · TX · 9.0 mi awayCORE SCIENTIFIC DATA CENTER SITE 1 AND 2 DENTON TEXAS — Built · Large load · TX · 11.9 mi awayDA12 (Dallas data centre) — Under construction · Large load · TX · 14.7 mi away
  • Loads
  • In development
  • Under construction
  • Operating
  • Size not stated
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Project #1, Expansion #2 - DFW Recycling & Disposal Facility

RNG project · Landfill gas to electricity

Key facts

RNG project · Landfill gas to electricity Retired
Location
Denton County, Texas
Operated by
WM Renewable Energy LLCSourceEPA Landfill Methane Outreach Program (LMOP) Landfill and Project Database — landfill gas energy projects (owner/developer, project type, capacity, status)

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Project type
Reciprocating Engine
Technology
Landfill gas to electricity
Rated capacity
6.4 MW
LFG flow to project
1.79 MMscf/d
Start year
2009

Capacity not stated

All 11 attributes from EPA Landfill Methane Outreach Program (LMOP) Landfill and Project Database — landfill gas energy projects (owner/developer, project type, capacity, status)
Attributes
AttributeValue
Landfills1
Actual generation (MW)3.87
Landfill opened1972
Landfill closure year2030
Project shutdown year2022
Waste in place (tons)72,550,188
Waste in place, year2022
Landfill gas collected (MMscf/d)8.55
Landfill gas generated (MMscf/d)10.94
Direct emission reductions (MMTCO2e/yr)0
Avoided emissions (MMTCO2e/yr)0

Timeline

  • In service · EPA LMOP

Around this asset

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
2501 Edmonds Ln Lewisville TX Data Center Filed Large load 2.6 mi
QUALITY INVESTMENT PROPERTIES IRVING Built Large load 8.4 mi
QTS 6431 Longhorn Dr. Irving TX Built Large load 8.4 mi
LR 1300 (Irving data centre) Filed Large load 8.9 mi
AREP LAS COLINAS DATA CENTER Under construction Large load 9.0 mi
CORE SCIENTIFIC DATA CENTER SITE 1 AND 2 DENTON TEXAS Built Large load 11.9 mi
DA12 (Dallas data centre) Under construction Large load 14.7 mi

Sources FAA OE/AAA · EPA ICIS-Air · EPA ICIS-NPDES

Sources

Attribution