Show on map
- Other infrastructure
- 10 · 100 · 1,000 MW
Map
- Other infrastructure
Project #1, Expansion #2 - Sampson County Disposal, LLC: location and 3 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Project #1, Expansion #2 - Sampson County Disposal, LLC
RNG project · Landfill gas to electricity
Key facts
RNG project · Landfill gas to electricity Retired- Location
- Sampson County, North Carolina
- Operated by
- GFL Environmental USA Inc.SourceEPA Landfill Methane Outreach Program (LMOP) Landfill and Project Database — landfill gas energy projects (owner/developer, project type, capacity, status)
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Project type
- Reciprocating Engine
- Technology
- Landfill gas to electricity
- Rated capacity
- 1.6 MW
- LFG flow to project
- 0.58 MMscf/d
- Start year
- 2014
Capacity not stated
All 12 attributes from EPA Landfill Methane Outreach Program (LMOP) Landfill and Project Database — landfill gas energy projects (owner/developer, project type, capacity, status)
| Attribute | Value |
|---|---|
| Landfills | 1 |
| Actual generation (MW) | 0.880 |
| Landfill opened | 2000 |
| Landfill closure year | 2036 |
| Project shutdown year | 2021 |
| Waste in place (tons) | 28,006,302 |
| Waste in place, year | 2022 |
| Landfill design capacity (tons) | 49,123,140 |
| Landfill gas collected (MMscf/d) | 3.84 |
| Landfill gas generated (MMscf/d) | 7.33 |
| Direct emission reductions (MMTCO2e/yr) | 0 |
| Avoided emissions (MMTCO2e/yr) | 0 |
Timeline
- In service · EPA LMOP
Around this asset
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Sampson County Disposal Postponed | Biomass | 0.4 mi | 3.2 |
| Holger Holdings Postponed | Solar | 10.3 mi | 5 |
| Garland Farm Postponed | Solar | 14.2 mi | 5 |
Sources EIA-860M