Show on map
- Other infrastructure
- 10 · 100 · 1,000 MW
Map
- Other infrastructure
Project #1, Expansion #2 - Seneca Meadows SWMF: location and 1 exact-grade project within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Project #1, Expansion #2 - Seneca Meadows SWMF
RNG project · Landfill gas to electricity
Key facts
RNG project · Landfill gas to electricity Operating- Location
- Seneca County, New York
- Operated by
- Archaea Energy, LLC
Details
Who’s behind it
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Project type
- Reciprocating Engine
- Technology
- Landfill gas to electricity
- Rated capacity
- 1.6 MW
- LFG flow to project
- 0.587 MMscf/d
- Start year
- 1997
Capacity not stated
All 11 attributes from EPA Landfill Methane Outreach Program (LMOP) Landfill and Project Database — landfill gas energy projects (owner/developer, project type, capacity, status)
| Attribute | Value |
|---|---|
| Landfills | 1 |
| Actual generation (MW) | 1.20 |
| Landfill opened | 1974 |
| Landfill closure year | 2025 |
| Waste in place (tons) | 52,621,226 |
| Waste in place, year | 2022 |
| Landfill design capacity (tons) | 64,866,690 |
| Landfill gas collected (MMscf/d) | 15.91 |
| Landfill gas generated (MMscf/d) | 20.20 |
| Direct emission reductions (MMTCO2e/yr) | 0.061 |
| Avoided emissions (MMTCO2e/yr) | 0.006 |
Ownership
2 companies2| Company | Role | Share | As of | Source |
|---|---|---|---|---|
| WASTE CONNECTIONS US INC | Owner | 100.0% | Dec 31, 2023 | EPA GHGRP |
| Archaea Energy, LLC | Operator | EPA LMOP |
Timeline
- In service · EPA LMOP
Sources
3 sourcesSources EPA LMOP · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT) · EPA Landfill Methane Outreach Program (LMOP) Landfill and Project Database — landfill gas energy projects (owner/developer, project type, capacity, status)
Around this asset
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Seneca Energy Postponed | Biomass | 0.8 mi | 6.4 |
Sources EIA-860M