Show on map
- Other infrastructure
- 10 · 100 · 1,000 MW
Map
- Other infrastructure
Project #1 - Hillsborough Heights LF: location and 2 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Project #1 - Hillsborough Heights LF
RNG project · Landfill gas direct use
Key facts
RNG project · Landfill gas direct use Retired- Location
- Hillsborough County, Florida
- Operated by
- Toro Energy, Inc.
Details
Who’s behind it
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Project type
- Direct Thermal
- Technology
- Landfill gas direct use
- LFG flow to project
- 0.72 MMscf/d
- Host landfill
- Hillsborough Heights LF
- Start year
- 1999
Capacity not stated
All 12 attributes from EPA Landfill Methane Outreach Program (LMOP) Landfill and Project Database — landfill gas energy projects (owner/developer, project type, capacity, status)
| Attribute | Value |
|---|---|
| EPA greenhouse gas reporting (GHGRP) |
|
| Landfills | 1 |
| Landfill opened | 1976 |
| Landfill closure year | 1984 |
| Project shutdown year | 2002 |
| Waste in place (tons) | 3,436,000 |
| Waste in place, year | 1984 |
| Landfill design capacity (tons) | 3,436,000 |
| Landfill gas collected (MMscf/d) | 0.827 |
| Landfill gas generated (MMscf/d) | 0.871 |
| Direct emission reductions (MMTCO2e/yr) | 0 |
| Avoided emissions (MMTCO2e/yr) | 0 |
Ownership
2 companies2| Company | Role | Share | As of | Source |
|---|---|---|---|---|
| Hillsborough County Board of County Commissioners | Owner | 100.0% | Dec 31, 2023 | EPA GHGRP |
| Toro Energy, Inc. | Operator | EPA LMOP |
Timeline
- In service · EPA LMOP
Sources
3 sourcesSources EPA LMOP · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT) · EPA Landfill Methane Outreach Program (LMOP) Landfill and Project Database — landfill gas energy projects (owner/developer, project type, capacity, status)
Around this asset
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| H L Culbreath Bayside Power Station Postponed | Gas, combustion turbine | 10.7 mi | 503.8 |
| Tampa Electric Co NA 2 Postponed | Gas, combustion turbine | 10.7 mi | 982 |
Sources EIA-860M