Show on map
- Other infrastructure
- 10 · 100 · 1,000 MW
Map
- Other infrastructure
Project #1 - IESI Timber Ridge Landfill: location and 1 exact-grade project within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Project #1 - IESI Timber Ridge Landfill
RNG project · Landfill gas direct use
Key facts
RNG project · Landfill gas direct use Retired- Location
- Washington County, Missouri
Details
Who’s behind it
- Owner
- Waste Connections US IncSource100.0%, EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT), as of Dec 31, 2023
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Project type
- Leachate Evaporation
- Technology
- Landfill gas direct use
- LFG flow to project
- 0.04 MMscf/d
- Host landfill
- IESI Timber Ridge Landfill
- Start year
- 2012
Capacity not stated
All 12 attributes from EPA Landfill Methane Outreach Program (LMOP) Landfill and Project Database — landfill gas energy projects (owner/developer, project type, capacity, status)
| Attribute | Value |
|---|---|
| EPA greenhouse gas reporting (GHGRP) |
|
| Landfills | 1 |
| Landfill opened | 2003 |
| Landfill closure year | 2060 |
| Project shutdown year | 2018 |
| Waste in place (tons) | 3,841,436 |
| Waste in place, year | 2022 |
| Landfill design capacity (tons) | 11,979,941 |
| Landfill gas collected (MMscf/d) | 1.17 |
| Landfill gas generated (MMscf/d) | 2.34 |
| Direct emission reductions (MMTCO2e/yr) | 0 |
| Avoided emissions (MMTCO2e/yr) | 0 |
Timeline
- In service · EPA LMOP
Around this asset
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Richwoods Renewable Energy Center Hybrid Postponed | Solar + storage | 2.6 mi | 14 |
Sources EIA-860M