Show on map
- Combustion
- Wind & solar
- Loads
- In development
- Under construction
- Operating
- Size not stated
- Other infrastructure
- 10 · 100 · 1,000 MW
Map
- Combustion
- Wind & solar
- Loads
- In development
- Under construction
- Operating
- Size not stated
- Other infrastructure
Project #1 - Metro RDF: location and 7 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Project #1 - Metro RDF
RNG project · Landfill gas to electricity
Key facts
RNG project · Landfill gas to electricity Operating- Location
- Milwaukee County, Wisconsin
- Operated by
- WM Renewable Energy LLCSourceEPA Landfill Methane Outreach Program (LMOP) Landfill and Project Database — landfill gas energy projects (owner/developer, project type, capacity, status)
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Project type
- Gas Turbine
- Technology
- Landfill gas to electricity
- Rated capacity
- 6.2 MW
- LFG flow to project
- 2.168 MMscf/d
- Host landfill
- Metro RDF
- Start year
- 1986
Capacity not stated
All 11 attributes from EPA Landfill Methane Outreach Program (LMOP) Landfill and Project Database — landfill gas energy projects (owner/developer, project type, capacity, status)
| Attribute | Value |
|---|---|
| Landfills | 1 |
| Actual generation (MW) | 2.68 |
| Landfill opened | 1951 |
| Landfill closure year | 2032 |
| Waste in place (tons) | 27,672,053 |
| Waste in place, year | 2022 |
| Landfill design capacity (tons) | 37,583,517 |
| Landfill gas collected (MMscf/d) | 4.82 |
| Landfill gas generated (MMscf/d) | 6.25 |
| Direct emission reductions (MMTCO2e/yr) | 0.136 |
| Avoided emissions (MMTCO2e/yr) | 0.013 |
Timeline
- In service · EPA LMOP
Around this asset
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Root River Solar WI, LLC Filed | Solar | 6.7 mi | 6 |
| Tichigan Solar WI, LLC Filed | Solar | 9.5 mi | 6 |
| City of Milwaukee- Airport Expansion Under construction | Solar | 10.6 mi | 4.6 |
| South Oak Creek Filed | Gas, combustion turbine | 11.9 mi | 1,181.5 |
| MLC 300 (Racine data centre) Filed | Large load | 12.6 mi | |
| 2250 (Racine data centre) Filed | Large load | 14.5 mi | |
| MICROSOFT CORPORATION - MKE 3B DATA CENTER Built | Large load | 14.8 mi |
Sources EIA-860M · FAA OE/AAA · EPA ICIS-Air