Project #1 - Roberts Road Landfill
RNG project · Landfill gas to electricity
Key facts
RNG project · Landfill gas to electricity Retired- Location
- Fayette County, Georgia
- Operated by
- EDL EnergySourceEPA Landfill Methane Outreach Program (LMOP) Landfill and Project Database — landfill gas energy projects (owner/developer, project type, capacity, status)
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Project type
- Reciprocating Engine
- Technology
- Landfill gas to electricity
- LFG flow to project
- 0.8 MMscf/d
- Host landfill
- Roberts Road Landfill
- Start year
- 2003
Capacity not stated
All 10 attributes from EPA Landfill Methane Outreach Program (LMOP) Landfill and Project Database — landfill gas energy projects (owner/developer, project type, capacity, status)
| Attribute | Value |
|---|---|
| Landfills | 1 |
| Actual generation (MW) | 1 |
| Landfill opened | 1976 |
| Landfill closure year | 1993 |
| Project shutdown year | 2012 |
| Waste in place (tons) | 4,214,375 |
| Landfill gas collected (MMscf/d) | 0.379 |
| Landfill gas generated (MMscf/d) | 0.465 |
| Direct emission reductions (MMTCO2e/yr) | 0 |
| Avoided emissions (MMTCO2e/yr) | 0 |
Timeline
- In service · EPA LMOP
Around this asset
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| QTS DC11 Data Center Filed | Large load | 4.6 mi | |
| QTS DC4 Data Center Filed | Large load | 5.6 mi | |
| DC-1 (Hampton data centre) Filed | Large load | 9.5 mi | |
| VANTAGE DATA CENTERS GA1, LLC Under construction | Large load | 9.7 mi | |
| CCO-06 DATA CENTER Under construction | Large load | 11.1 mi | |
| ATL06 DATA CENTER Under construction | Large load | 11.6 mi | |
| FT GIllem MASE Crane (Forest Park data centre) Filed | Large load | 11.7 mi | |
| EDGECONNEX ATL11, LLC Filed | Large load | 11.7 mi | |
| TA Reality Ellenwood Data Center Filed | Large load | 13.1 mi |
Sources FAA OE/AAA · EPA ICIS-Air · Georgia EPD · EPA ICIS-NPDES
Sources
- FAA OE/AAA
- EPA ICIS-Air
- Georgia EPDSource: Georgia Environmental Protection Division, Air Protection Branch
- EPA ICIS-NPDES