Project #1 - Salt Lake Valley LF — RNG project · Landfill gas to electricity · DTE Vantage; Energy Power PartnersALIGNED DATA CENTER SLC-4 — Built · Large load · UT · 2.1 mi awayKennecott Power Plant — Postponed · Gas, combined cycle · UT · 214.3 MW · 4.8 mi awayDATA CENTER (200 S 200 E SLC) — Built · Large load · UT · 8.3 mi awayVAST DATA CENTER — Built · Large load · UT · 11.9 mi awayProject Sequoia- Data Center — Filed · Large load · UT · 12.1 mi awayCONDUENT DATA CENTER — Large load · UT · 12.8 mi away
  • Loads
  • In development
  • Operating
  • Stage not stated
  • Size not stated
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Project #1 - Salt Lake Valley LF

RNG project · Landfill gas to electricity

Key facts

RNG project · Landfill gas to electricity Operating
Location
Salt Lake County, Utah
Operated by
DTE Vantage; Energy Power PartnersSourceEPA Landfill Methane Outreach Program (LMOP) Landfill and Project Database — landfill gas energy projects (owner/developer, project type, capacity, status)

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Project type
Reciprocating Engine
Technology
Landfill gas to electricity
Rated capacity
3.2 MW
LFG flow to project
1.518 MMscf/d
Host landfill
Salt Lake Valley LF
Start year
2006

Capacity not stated

All 10 attributes from EPA Landfill Methane Outreach Program (LMOP) Landfill and Project Database — landfill gas energy projects (owner/developer, project type, capacity, status)
Attributes
AttributeValue
Landfills1
Actual generation (MW)2.93
Landfill opened1982
Landfill closure year2082
Waste in place (tons)18,194,683
Waste in place, year2022
Landfill design capacity (tons)43,739,621
Landfill gas collected (MMscf/d)4.05
Direct emission reductions (MMTCO2e/yr)0.148
Avoided emissions (MMTCO2e/yr)0.014

Timeline

  • In service · EPA LMOP

Around this asset

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
ALIGNED DATA CENTER SLC-4 Built Large load 2.1 mi
Kennecott Power Plant Postponed Gas, combined cycle 4.8 mi 214.3
DATA CENTER (200 S 200 E SLC) Built Large load 8.3 mi
VAST DATA CENTER Built Large load 11.9 mi
Project Sequoia- Data Center Filed Large load 12.1 mi
CONDUENT DATA CENTER Unknown Large load 12.8 mi

Sources EPA ICIS-NPDES · EIA-860M · FAA OE/AAA

Sources

Attribution