Show on map
Project #1 - Seabreeze Environmental Landfill — RNG project · Renewable natural gas · DTE VantageBrazoria Solar I — Under construction · Solar · TX · 250 MW · 3.4 mi awayFreeport Energy Center — Postponed · Gas, combined cycle · TX · 180 MW · 7.4 mi awayWindmill Ridge Storage — Postponed · Storage · TX · 151.4 MW · 9.9 mi awayMyrtle Solar, LLC — Under construction · Solar · TX · 313 MW · 10.3 mi awayCottonwood Bayou Solar — Built · Solar · TX · 351.4 MW · 13.4 mi awayBodkin BESS — Permitted · Storage · TX · 75 MW · 14.3 mi awayCradle Solar — Postponed · Solar · TX · 225 MW · 14.7 mi awayRock N' Roll — Studied · Solar + storage · TX · 358 MW · 14.9 mi away
  • Wind & solar
  • Storage
  • In development
  • Under construction
  • Operating
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Project #1 - Seabreeze Environmental Landfill

RNG project · Renewable natural gas

Key facts

RNG project · Renewable natural gas Operating
Location
Brazoria County, Texas
Operated by
DTE VantageSourceEPA Landfill Methane Outreach Program (LMOP) Landfill and Project Database — landfill gas energy projects (owner/developer, project type, capacity, status)

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Project type
Industrial
Technology
Renewable natural gas
LFG flow to project
1.34 MMscf/d
Host landfill
Seabreeze Environmental Landfill
Start year
2018

Capacity not stated

All 10 attributes from EPA Landfill Methane Outreach Program (LMOP) Landfill and Project Database — landfill gas energy projects (owner/developer, project type, capacity, status)
Attributes
AttributeValue
Landfills1
Landfill opened1974
Landfill closure year2044
Waste in place (tons)28,593,937
Waste in place, year2022
Landfill design capacity (tons)62,102,405
Landfill gas collected (MMscf/d)1.71
Landfill gas generated (MMscf/d)10.70
Direct emission reductions (MMTCO2e/yr)0.131
Avoided emissions (MMTCO2e/yr)0.012

Timeline

  • In service · EPA LMOP

Around this asset

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Brazoria Solar I Under construction Solar 3.4 mi 250
Freeport Energy Center Postponed Gas, combined cycle 7.4 mi 180
Windmill Ridge Storage Postponed Storage 9.9 mi 151.4
Myrtle Solar, LLC Under construction Solar 10.3 mi 313
Cottonwood Bayou Solar Built Solar 13.4 mi 351.4
Bodkin BESS Permitted Storage 14.3 mi 75
Cradle Solar Postponed Solar 14.7 mi 225
Rock N' Roll Studied Solar + storage 14.9 mi 358

Sources EIA-860M · ERCOT

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • ERCOTOpen license · retrieved Nov 4, 2026

Attribution