Show on map
- Wind & solar
- Loads
- In development
- Size not stated
- Other infrastructure
- 10 · 100 · 1,000 MW
Map
- Wind & solar
- Loads
- In development
- Size not stated
- Other infrastructure
Project #1 - Suburban South R&D: location and 4 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Project #1 - Suburban South R&D
RNG project · Landfill gas to electricity
Key facts
RNG project · Landfill gas to electricity Operating- Location
- Perry County, Ohio
- Operated by
- WM Renewable Energy LLCSourceEPA Landfill Methane Outreach Program (LMOP) Landfill and Project Database — landfill gas energy projects (owner/developer, project type, capacity, status)
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
- Project type
- Reciprocating Engine
- Technology
- Landfill gas to electricity
- Rated capacity
- 5.6 MW
- LFG flow to project
- 1.89 MMscf/d
- Host landfill
- Suburban South R&D
- Start year
- 2011
Capacity not stated
All 11 attributes from EPA Landfill Methane Outreach Program (LMOP) Landfill and Project Database — landfill gas energy projects (owner/developer, project type, capacity, status)
| Attribute | Value |
|---|---|
| Landfills | 1 |
| Actual generation (MW) | 3.72 |
| Landfill opened | 1982 |
| Landfill closure year | 2162 |
| Waste in place (tons) | 14,830,566 |
| Waste in place, year | 2022 |
| Landfill design capacity (tons) | 47,346,507 |
| Landfill gas collected (MMscf/d) | 1.90 |
| Landfill gas generated (MMscf/d) | 4.27 |
| Direct emission reductions (MMTCO2e/yr) | 0.188 |
| Avoided emissions (MMTCO2e/yr) | 0.018 |
Timeline
- In service · EPA LMOP
Around this asset
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Eastern Cottontail Solar Filed | Solar | 11.1 mi | 220 |
| ALTEC AC30-101B (Millersport data centre) Filed | Large load | 13.9 mi | |
| CMH47 Land Development Bulkhead Filed | Large load | 14.5 mi | |
| Ripley Solar Postponed | Solar | 14.9 mi | 100 |
Sources EIA-860M · FAA OE/AAA