Show on map
Project #1 - Suburban South R&D — RNG project · Landfill gas to electricity · WM Renewable Energy LLCEastern Cottontail Solar — Filed · Solar · OH · 220 MW · 11.1 mi awayALTEC AC30-101B (Millersport data centre) — Filed · Large load · OH · 13.9 mi awayCMH47 Land Development Bulkhead — Filed · Large load · OH · 14.5 mi awayRipley Solar — Postponed · Solar · OH · 100 MW · 14.9 mi away
  • Wind & solar
  • Loads
  • In development
  • Size not stated
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Project #1 - Suburban South R&D

RNG project · Landfill gas to electricity

Key facts

RNG project · Landfill gas to electricity Operating
Location
Perry County, Ohio
Operated by
WM Renewable Energy LLCSourceEPA Landfill Methane Outreach Program (LMOP) Landfill and Project Database — landfill gas energy projects (owner/developer, project type, capacity, status)

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Project type
Reciprocating Engine
Technology
Landfill gas to electricity
Rated capacity
5.6 MW
LFG flow to project
1.89 MMscf/d
Host landfill
Suburban South R&D
Start year
2011

Capacity not stated

All 11 attributes from EPA Landfill Methane Outreach Program (LMOP) Landfill and Project Database — landfill gas energy projects (owner/developer, project type, capacity, status)
Attributes
AttributeValue
Landfills1
Actual generation (MW)3.72
Landfill opened1982
Landfill closure year2162
Waste in place (tons)14,830,566
Waste in place, year2022
Landfill design capacity (tons)47,346,507
Landfill gas collected (MMscf/d)1.90
Landfill gas generated (MMscf/d)4.27
Direct emission reductions (MMTCO2e/yr)0.188
Avoided emissions (MMTCO2e/yr)0.018

Timeline

  • In service · EPA LMOP

Around this asset

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Eastern Cottontail Solar Filed Solar 11.1 mi 220
ALTEC AC30-101B (Millersport data centre) Filed Large load 13.9 mi
CMH47 Land Development Bulkhead Filed Large load 14.5 mi
Ripley Solar Postponed Solar 14.9 mi 100

Sources EIA-860M · FAA OE/AAA

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • FAA OE/AAAOpen license · retrieved Nov 16, 2026

Attribution