Show on map
Project #1 - Sunset Farms Landfill — RNG project · Landfill gas to electricity · Fortistar Methane GroupPecan Crossing Building 2 (Pflugerville data centre) — Filed · Large load · TX · 6.1 mi awayAustin TX GigaFactory — Under construction · Solar · TX · 2.3 MW · 7.9 mi awayAustin TX GigaFactory — Postponed · Solar · TX · 1 MW · 7.9 mi awayAMD Phase 2 (Austin data centre) — Filed · Large load · TX · 9.6 mi awayAUSTIN DATA CENTER 2 — Under construction · Large load · TX · 10.2 mi awaySABEY DATA CENTER AUSTIN — Under construction · Large load · TX · 10.7 mi awayBuilding B (Round Rock data centre) — Filed · Large load · TX · 10.8 mi awaySMT DC Austin I (Austin data centre) — Filed · Large load · TX · 12.9 mi away
  • Wind & solar
  • Loads
  • In development
  • Under construction
  • Size not stated
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Project #1 - Sunset Farms Landfill

RNG project · Landfill gas to electricity

Key facts

RNG project · Landfill gas to electricity Retired
Location
Travis County, Texas

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Project type
Reciprocating Engine
Technology
Landfill gas to electricity
LFG flow to project
2.09 MMscf/d
Host landfill
Sunset Farms Landfill
Start year
1996

Capacity not stated

All 13 attributes from EPA Landfill Methane Outreach Program (LMOP) Landfill and Project Database — landfill gas energy projects (owner/developer, project type, capacity, status)
Attributes
AttributeValue
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110002371870
Subparts reported
HH
NAICS code
562212
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1006747
Landfills1
Actual generation (MW)3
Landfill opened1982
Landfill closure year2015
Project shutdown year2016
Waste in place (tons)22,281,720
Waste in place, year2015
Landfill design capacity (tons)26,630,028
Landfill gas collected (MMscf/d)3.13
Landfill gas generated (MMscf/d)3.82
Direct emission reductions (MMTCO2e/yr)0
Avoided emissions (MMTCO2e/yr)0

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
REPUBLIC SERVICES INC Owner 100.0% Dec 31, 2023 EPA GHGRP
Fortistar Methane Group Operator EPA LMOP

Timeline

  • In service · EPA LMOP

Around this asset

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Pecan Crossing Building 2 (Pflugerville data centre) Filed Large load 6.1 mi
Austin TX GigaFactory × 2 units Under construction Solar 7.9 mi 3.3
AMD Phase 2 (Austin data centre) Filed Large load 9.6 mi
AUSTIN DATA CENTER 2 Under construction Large load 10.2 mi
SABEY DATA CENTER AUSTIN Under construction Large load 10.7 mi
Building B (Round Rock data centre) Filed Large load 10.8 mi
SMT DC Austin I (Austin data centre) Filed Large load 12.9 mi

Sources FAA OE/AAA · EIA-860M · EPA ICIS-NPDES

Sources

Attribution