Project #1 - Wheeler RDF — RNG project · Landfill gas to electricity · Wabash Valley Power AllianceHOBART DATA CENTER MASS GRADING - 1 — Under construction · Large load · IN · 4.4 mi awayMerrillville Solar — Announced · Solar · IN · 100 MW · 5.3 mi awayDATA CENTER — Built · Large load · IN · 6.7 mi away
  • Wind & solar
  • Loads
  • In development
  • Under construction
  • Operating
  • Size not stated
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Project #1 - Wheeler RDF

RNG project · Landfill gas to electricity

Key facts

RNG project · Landfill gas to electricity Retired
Location
LaPorte County, Indiana
Operated by
Wabash Valley Power AllianceSourceEPA Landfill Methane Outreach Program (LMOP) Landfill and Project Database — landfill gas energy projects (owner/developer, project type, capacity, status)

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Project type
Reciprocating Engine
Technology
Landfill gas to electricity
Rated capacity
2.4 MW
LFG flow to project
1.21 MMscf/d
Host landfill
Wheeler RDF
Start year
1997

Capacity not stated

All 12 attributes from EPA Landfill Methane Outreach Program (LMOP) Landfill and Project Database — landfill gas energy projects (owner/developer, project type, capacity, status)
Attributes
AttributeValue
Landfills1
Actual generation (MW)2.40
Landfill opened1977
Landfill closure year1993
Project shutdown year1999
Waste in place (tons)2,836,860
Waste in place, year1993
Landfill design capacity (tons)3,120,797
Landfill gas collected (MMscf/d)0.419
Landfill gas generated (MMscf/d)0.586
Direct emission reductions (MMTCO2e/yr)0
Avoided emissions (MMTCO2e/yr)0

Timeline

  • In service · EPA LMOP

Around this asset

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
HOBART DATA CENTER MASS GRADING - 1 Under construction Large load 4.4 mi
Merrillville Solar Announced Solar 5.3 mi 100
DATA CENTER Built Large load 6.7 mi

Sources EPA ICIS-NPDES · EIA-860M