Show on map
- Wind & solar
- Loads
- In development
- Under construction
- Operating
- Size not stated
- Other infrastructure
- 10 · 100 · 1,000 MW
Map
- Wind & solar
- Loads
- In development
- Under construction
- Operating
- Size not stated
- Other infrastructure
Project #2 - Austin Community RDF: location and 9 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Project #2 - Austin Community RDF
RNG project · Landfill gas to electricity
Key facts
RNG project · Landfill gas to electricity Operating- Location
- Travis County, Texas
- Operated by
- WM Renewable Energy LLCSourceEPA Landfill Methane Outreach Program (LMOP) Landfill and Project Database — landfill gas energy projects (owner/developer, project type, capacity, status)
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Project type
- Reciprocating Engine
- Technology
- Landfill gas to electricity
- Rated capacity
- 4.8 MW
- LFG flow to project
- 1.84 MMscf/d
- Host landfill
- Austin Community RDF
- Start year
- 2007
Capacity not stated
All 11 attributes from EPA Landfill Methane Outreach Program (LMOP) Landfill and Project Database — landfill gas energy projects (owner/developer, project type, capacity, status)
| Attribute | Value |
|---|---|
| Landfills | 1 |
| Actual generation (MW) | 3.42 |
| Landfill opened | 1981 |
| Landfill closure year | 2026 |
| Waste in place (tons) | 25,408,112 |
| Waste in place, year | 2022 |
| Landfill design capacity (tons) | 27,024,366 |
| Landfill gas collected (MMscf/d) | 4.25 |
| Landfill gas generated (MMscf/d) | 5.30 |
| Direct emission reductions (MMTCO2e/yr) | 0.173 |
| Avoided emissions (MMTCO2e/yr) | 0.017 |
Timeline
- In service · EPA LMOP
Around this asset
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Pecan Crossing Building 2 (Pflugerville data centre) Filed | Large load | 5.2 mi | |
| Austin TX GigaFactory × 2 units Under construction | Solar | 8.6 mi | 3.3 |
| AUSTIN DATA CENTER 2 Under construction | Large load | 9.5 mi | |
| SABEY DATA CENTER AUSTIN Under construction | Large load | 10.1 mi | |
| Building B (Round Rock data centre) Filed | Large load | 10.2 mi | |
| AMD Phase 2 (Austin data centre) Filed | Large load | 10.5 mi | |
| SMT DC Austin I (Austin data centre) Filed | Large load | 13.5 mi | |
| HUTTO DATA CENTER CAMPUS Built | Large load | 14.6 mi |
Sources FAA OE/AAA · EIA-860M · EPA ICIS-NPDES