Show on map
Project #2 - Los Angeles Landfill — RNG project · Landfill gas to electricity · City of Albuquerque, EHD, NMCSC-A — Built · Large load · NM · 2.0 mi awayOSO GRANDE TECHNOLOGY — Filed · Large load · NM · 6.8 mi awayCNM WESTSIDE DATA CENTER — Filed · Large load · NM · 7.4 mi awayALBUQUERQUE PUBLIC SCHOOLS: DATA CENTER — Built · Large load · NM · 7.6 mi awayOso Negro — Permitted · Storage · NM · 100 MW · 8.2 mi awayPRESBYTERIAN HEALTHCARE INFO SYS CTR — Built · Large load · NM · 8.8 mi awayWESTPOINTE DATA CENTER — Built · Large load · NM · 10.2 mi awaySLO-2 — Under construction · Solar · NM · 5 MW · 12.7 mi awayCorazon Energy Storage — Under construction · Storage · NM · 150 MW · 14.6 mi away
  • Wind & solar
  • Storage
  • Loads
  • In development
  • Under construction
  • Operating
  • Size not stated
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Project #2 - Los Angeles Landfill

RNG project · Landfill gas to electricity

Key facts

RNG project · Landfill gas to electricity Retired
Location
Bernalillo County, New Mexico
Operated by
City of Albuquerque, EHD, NMSourceEPA Landfill Methane Outreach Program (LMOP) Landfill and Project Database — landfill gas energy projects (owner/developer, project type, capacity, status)

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Project type
Microturbine
Technology
Landfill gas to electricity
Host landfill
Los Angeles Landfill
Start year
2006

Capacity not stated

All 10 attributes from EPA Landfill Methane Outreach Program (LMOP) Landfill and Project Database — landfill gas energy projects (owner/developer, project type, capacity, status)
Attributes
AttributeValue
Landfills1
Actual generation (MW)0.070
Landfill opened1978
Landfill closure year1983
Project shutdown year2011
Waste in place (tons)1,560,846
Waste in place, year1983
Landfill gas collected (MMscf/d)0.290
Direct emission reductions (MMTCO2e/yr)0
Avoided emissions (MMTCO2e/yr)0

Timeline

  • In service · EPA LMOP

Around this asset

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
CSC-A Built Large load 2.0 mi
OSO GRANDE TECHNOLOGY Filed Large load 6.8 mi
CNM WESTSIDE DATA CENTER Filed Large load 7.4 mi
ALBUQUERQUE PUBLIC SCHOOLS: DATA CENTER Built Large load 7.6 mi
Oso Negro Permitted Storage 8.2 mi 100
PRESBYTERIAN HEALTHCARE INFO SYS CTR Built Large load 8.8 mi
WESTPOINTE DATA CENTER Built Large load 10.2 mi
SLO-2 Under construction Solar 12.7 mi 5
Corazon Energy Storage Under construction Storage 14.6 mi 150

Sources EPA ICIS-Air · EIA-860M · EPA ICIS-NPDES · Berkeley Lab

Sources

  • EPA ICIS-AirOpen license · retrieved Nov 16, 2026
  • EIA-860MOpen license · retrieved Nov 4, 2026
  • EPA ICIS-NPDESOpen license · retrieved Nov 16, 2026
  • Berkeley LabOpen license, with credit · retrieved Nov 4, 2026Lawrence Berkeley National Laboratory and GridTracker, Queued Up data file (2026 edition), CC BY 4.0. Modified by Inframation: non-ISO and MISO regions only; MISO rows labelled with the date the file's queue data runs to; statuses and technologies mapped to Inframation's vocabulary. Queued Up Data File. Copyright (c) 2026, The Regents of the University of California, through Lawrence Berkeley National Laboratory (subject to receipt of any required approvals from the U.S. Dept. of Energy) & GridTracker.

Attribution