Show on map
Project #2 - Prairie View RDF — RNG project · Renewable natural gas · Will County, ILElwood 1-SLCHI901 — Postponed · Solar · IL · 1.3 MW · 3.6 mi awayDresden Island Hydroelectric Project — Filed · Hydro · IL · 10 MW · 9.0 mi awayNL IL Braceville — Under construction · Solar · IL · 5 MW · 9.8 mi awayIL2 - W109 — Under construction · Solar · IL · 4.9 MW · 10.6 mi awayEQUINIX LLC — Built · Large load · IL · 11.6 mi awayGillard — Under construction · Solar · IL · 5 MW · 13.2 mi away
  • Clean firm
  • Wind & solar
  • Loads
  • In development
  • Under construction
  • Operating
  • Size not stated
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Project #2 - Prairie View RDF

RNG project · Renewable natural gas

Key facts

RNG project · Renewable natural gas Operating
Location
Will County, Illinois
Operated by
Will County, ILSourceEPA Landfill Methane Outreach Program (LMOP) Landfill and Project Database — landfill gas energy projects (owner/developer, project type, capacity, status)

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Project type
Vehicle Fuel
Technology
Renewable natural gas
LFG flow to project
0.44 MMscf/d
Host landfill
Prairie View RDF
Start year
2022

Capacity not stated

All 10 attributes from EPA Landfill Methane Outreach Program (LMOP) Landfill and Project Database — landfill gas energy projects (owner/developer, project type, capacity, status)
Attributes
AttributeValue
Landfills1
Landfill opened2004
Landfill closure year2034
Waste in place (tons)13,735,256
Waste in place, year2022
Landfill design capacity (tons)24,161,285
Landfill gas collected (MMscf/d)5.38
Landfill gas generated (MMscf/d)6.48
Direct emission reductions (MMTCO2e/yr)0.043
Avoided emissions (MMTCO2e/yr)0.003

Timeline

  • In service · EPA LMOP

Around this asset

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Elwood 1-SLCHI901 Postponed Solar 3.6 mi 1.3
Dresden Island Hydroelectric Project Filed Hydro 9.0 mi 10
NL IL Braceville Under construction Solar 9.8 mi 5
IL2 - W109 Under construction Solar 10.6 mi 4.9
EQUINIX LLC Built Large load 11.6 mi
Gillard Under construction Solar 13.2 mi 5

Sources EIA-860M · EPA ICIS-Air

Sources

Attribution