Show on map
- Clean firm
- Wind & solar
- Loads
- In development
- Under construction
- Operating
- Size not stated
- Other infrastructure
- 10 · 100 · 1,000 MW
Map
- Clean firm
- Wind & solar
- Loads
- In development
- Under construction
- Operating
- Size not stated
- Other infrastructure
Project #2 - Prairie View RDF: location and 6 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Project #2 - Prairie View RDF
RNG project · Renewable natural gas
Key facts
RNG project · Renewable natural gas Operating- Location
- Will County, Illinois
- Operated by
- Will County, ILSourceEPA Landfill Methane Outreach Program (LMOP) Landfill and Project Database — landfill gas energy projects (owner/developer, project type, capacity, status)
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Project type
- Vehicle Fuel
- Technology
- Renewable natural gas
- LFG flow to project
- 0.44 MMscf/d
- Host landfill
- Prairie View RDF
- Start year
- 2022
Capacity not stated
All 10 attributes from EPA Landfill Methane Outreach Program (LMOP) Landfill and Project Database — landfill gas energy projects (owner/developer, project type, capacity, status)
| Attribute | Value |
|---|---|
| Landfills | 1 |
| Landfill opened | 2004 |
| Landfill closure year | 2034 |
| Waste in place (tons) | 13,735,256 |
| Waste in place, year | 2022 |
| Landfill design capacity (tons) | 24,161,285 |
| Landfill gas collected (MMscf/d) | 5.38 |
| Landfill gas generated (MMscf/d) | 6.48 |
| Direct emission reductions (MMTCO2e/yr) | 0.043 |
| Avoided emissions (MMTCO2e/yr) | 0.003 |
Timeline
- In service · EPA LMOP
Around this asset
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Elwood 1-SLCHI901 Postponed | Solar | 3.6 mi | 1.3 |
| Dresden Island Hydroelectric Project Filed | Hydro | 9.0 mi | 10 |
| NL IL Braceville Under construction | Solar | 9.8 mi | 5 |
| IL2 - W109 Under construction | Solar | 10.6 mi | 4.9 |
| EQUINIX LLC Built | Large load | 11.6 mi | |
| Gillard Under construction | Solar | 13.2 mi | 5 |
Sources EIA-860M · EPA ICIS-Air