Show on map
Prospect Storage — Power plant · Storage · GlidePath Power Operations LLCCastor — Storage · TX · 200 MW · 0.1 km awayBell Creek BESS LLC — Storage · TX · 200.9 MW · 2.1 km awayBrazos River BESS LLC — Storage · TX · 180.4 MW · 2.9 km awaySecond Division Solar — Storage · TX · 30 MW · 9.1 km awayElio Energy LLC — Storage · TX · 205.3 MW · 11.4 km awayNash Solar — Solar · TX · 10 MW · 12.8 km awayWindmill Ridge Storage — Storage · TX · 151.4 MW · 19.8 km awayMyrtle Solar, LLC — Solar · TX · 313 MW · 23.4 km awayWittig Solar Park — Solar · TX · 106.9 MW · 24.2 km away
  • Wind & solar
  • Storage
  • In development
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

Prospect Storage

Power plant · Storage

Key facts

Power plant · Storage Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2020
Net generation, 2025
-310 MWh
Grid
12 kV to Texas-New Mexico Power Co (ERCO)
Location
Brazoria County, Texas
Operated by
GlidePath Power Operations LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2020 to 2026

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Storage source: “Batteries”
Age
6 years since 2020
All 4 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
TRE
Report year
2025
Grid voltage kv
12.50
Transmission owner
Texas-New Mexico Power Co
Balancing authority code
ERCO
Balancing authority name
Electric Reliability Council of Texas, Inc.
Fuel burned (MMBtu), 20250
Net generation (MWh), 2025-310
Balancing authority codeERCO
Data notes (1)
  • Capacity factor, 2025 not shown: net generation -310.0 MWh is not positive (the plant consumed at least as much as it produced over the year)

Timeline

  • In service · EIA-860M

Sources

3 sources

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Castor Under construction Storage 0.1 km 200
Bell Creek BESS LLC Contracted Storage 2.1 km 200.9
Brazos River BESS LLC Contracted Storage 2.9 km 180.4
Second Division Solar Studied Storage 9.1 km 30
Elio Energy LLC Contracted Storage 11.4 km 205.3
Nash Solar Under construction Solar 12.8 km 10
Windmill Ridge Storage Postponed Storage 19.8 km 151.4
Myrtle Solar, LLC Under construction Solar 23.4 km 313
Wittig Solar Park Permitted Solar 24.2 km 106.9

Sources EIA-860M · ERCOT

Sources

Attribution