Provo
Power plant · Gas, reciprocating engine
Key facts
Power plant · Gas, reciprocating engineran 0% of 2015 Retired- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 1949
- Net generation, 2015
- 521 MWh
- Location
- Utah County, Utah
- Operated by
- Provo City CorpSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Output
- Gas
- Oil
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Gas, reciprocating engine source: “Natural Gas Internal Combustion Engine”
- Age
- 77 years since 1949
1 attribute from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Balancing authority code | PACE |
Retirement
EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.- Retired
- June 2016
- Capacity retired
- 17.5 MW
- Generators retired
- 5
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| 4 | Natural Gas Steam Turbine | 7.5 MW | Retired | June 2016 |
| 5 | Natural Gas Internal Combustion Engine | 2.5 MW | Retired | June 2016 |
| 6 | Natural Gas Internal Combustion Engine | 2.5 MW | Retired | June 2016 |
| 7 | Natural Gas Internal Combustion Engine | 2.5 MW | Retired | June 2016 |
| 8 | Natural Gas Internal Combustion Engine | 2.5 MW | Retired | June 2016 |
By technology
| Technology | Retired | Scheduled to retire |
|---|---|---|
| Natural Gas Internal Combustion Engine | 10 MW | |
| Natural Gas Steam Turbine | 7.5 MW |
Grid
EIA-860Grid fieldsAs the plant reported them to EIA-860 (Schedule 2).- Balancing authority
- PACE
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Timeline
- Stated Units 4, 5, 6, 7, 8 scheduled to retire, 17.5 MW · EIA-860M
- In service · EIA-860M
Sources
3 sourcesSources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory
Sources
- EIA-860M Preliminary Monthly Electric Generator Inventory
- EIA Open Data bulk file — Electricity (ELEC.zip; monthly plant net generation and fuel consumption since 2001)Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory