Show on map
Pueblo Airport Generating Station — Power plant · Gas, combustion turbine · Black Hills Service Company LLCPueblo Airport Generating Station unit BA7 — Studied · Storage · CO · 50 MW · 0.0 mi awayPueblo Airport Generating Station unit GT3 — Postponed · Gas, combustion turbine · CO · 100 MW · 0.0 mi awayWaxwing Solar CSG — Under construction · Solar · CO · 3 MW · 2.2 mi awayStagecoach LRE — Permitted · Solar · CO · 230 MW · 10.0 mi awayArroyo Solar — Under construction · Solar · CO · 335 MW · 11.1 mi awayVestas Towers America, Inc. — Postponed · Wind · CO · 3 MW · 11.4 mi away
  • Combustion
  • Wind & solar
  • Storage
  • In development
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

Pueblo Airport Generating Station

Power plant · Gas, combustion turbine

Key facts

Power plant · Gas, combustion turbineran 42% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2012
Net generation, 2025
1,604,918 MWh
Grid
115 kV to Black Hills/Colorado Elec.Util (PSCO)
Location
Pueblo County, Colorado

Output

Net generation MWh by year, 2012 to 2026
Fuel burned MMBtu by year, 2012 to 2026
  • Gas

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, combustion turbine source: “Natural Gas Fired Combustion Turbine”
Age
14 years since 2012
Unused energy
2,249 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
Heat rate
9,266 Btu/kWh 2025
All 7 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
WECC
Report year
2025
Grid voltage kv
115
Transmission owner
Black Hills/Colorado Elec.Util
Balancing authority code
PSCO
Balancing authority name
Public Service Company of Colorado
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110055506527
Subparts reported
D
NAICS code
221112
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1000558
Fuel burned (MMBtu), 202514,871,004
Capacity factor, 20250.416
Heat rate (Btu/kWh), 20259,265.9
Net generation (MWh), 20251,604,918
Balancing authority codePSCO

Ownership

4 companies4
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
Black Hills Service Company LLC Operator EIA-860M
BLACK HILLS CORP Owner 100.0% Dec 31, 2023 EPA GHGRP
Black Hills Colorado IPP, LLC Owner 45.5% Dec 31, 2025 EIA-860
Black Hills Colorado Electric, LLC Owner 54.5% Dec 31, 2025 EIA-860

Timeline

  • In service · EIA-860M

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Pueblo Airport Generating Station × 2 units Studied Storage 0.0 mi 150
Waxwing Solar CSG Under construction Solar 2.2 mi 3
Stagecoach LRE Permitted Solar 10.0 mi 230
Arroyo Solar Under construction Solar 11.1 mi 335
Vestas Towers America, Inc. Postponed Wind 11.4 mi 3

Sources Berkeley Lab · EIA-860M

Sources

  • Berkeley LabOpen license, with credit · retrieved Nov 4, 2026Lawrence Berkeley National Laboratory and GridTracker, Queued Up data file (2026 edition), CC BY 4.0. Modified by Inframation: non-ISO and MISO regions only; MISO rows labelled with the date the file's queue data runs to; statuses and technologies mapped to Inframation's vocabulary. Queued Up Data File. Copyright (c) 2026, The Regents of the University of California, through Lawrence Berkeley National Laboratory (subject to receipt of any required approvals from the U.S. Dept. of Energy) & GridTracker.
  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution