Show on map
Putnam — Power plant · Gas, combined cycle · Florida Power & Light CoSeminole (FL) — Coal · FL · 850 MW · 12.5 km away
  • Combustion
  • Retired
  • 10 · 100 · 1,000 MW

Power plant · Gas, combined cycle

Key facts

Power plant · Gas, combined cycleran 12% of 2014 Retired
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1977
Net generation, 2014
591,503 MWh
Grid
230 kV to Florida Power & Light Co (FPL)
Location
Putnam County, Florida
Operated by
Florida Power & Light CoSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2001 to 2014
Fuel burned MMBtu by year, 2001 to 2014
  • Gas
  • Oil

Operations detail

Details

Who’s behind it

Owner
Florida Power & Light CoSource100.0%, EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT), as of 31 Dec 2023

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, combined cycle source: “Natural Gas Fired Combined Cycle”
Age
49 years since 1977
All 2 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110006645238
NAICS code
221112
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1007982
Balancing authority codeFPL

Retirement

EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.
Retired
December 2014
Capacity retired
580 MW
Generators retired
6
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
1GT1Natural Gas Fired Combined Cycle85 MWRetiredDecember 2014
1GT2Natural Gas Fired Combined Cycle85 MWRetiredDecember 2014
1STNatural Gas Fired Combined Cycle120 MWRetiredDecember 2014
2GT1Natural Gas Fired Combined Cycle85 MWRetiredDecember 2014
2GT2Natural Gas Fired Combined Cycle85 MWRetiredDecember 2014
2STNatural Gas Fired Combined Cycle120 MWRetiredDecember 2014

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
230 kV
Transmission or distribution system owner
Florida Power & Light Co
Balancing authority
Florida Power & Light Company
NERC region
SERC
Transmission lines within 25 km (10)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Timeline

  • Stated Units 1GT1, 1GT2, 1ST, 2GT1, 2GT2, 2ST scheduled to retire, 580 MW · EIA-860M
  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Seminole (FL) Postponed Coal 12.5 km 850

Sources EIA-860M

Sources

Attribution